This is a floating closed javascript menu.
Menu


Post-1964 Legistlative Route Graphic

Former State Route 480

Click here for a key to the symbols used. An explanation of acronyms may be found at the bottom of the page.


Routing Routing

Rte 480 - 1966 through 1982Nocurrent routing.

Post 1964 Signage History Post 1964 Signage History

In 1963, Route 480 was defined as "Route 80 at the San Francisco-Oakland Bay Bridge approach in San Francisco to the junction of Route 280, Funston approach, and the approach to the Golden Gate Bridge in the Presidio of San Francisco passing near the intersection of Lombard Street and Van Ness Avenue."

A post on AAroads provides the construction history: "The initial construction of the Embarcadero Freeway in San Francisco began in mid 1955 from the Bay Bridge - San Francisco Skyway (I-80, then US 40/US 50) just past 4th St. to about 1st St. It then was extended to above Beale St., with on/off ramps at Mission St. between Beale & Main Sts., opening in January, 1957. Construction of the main portion along the Embarcadero was delayed for several months during 1956, but picked up again in early 1957, with construction commencing at both ends (above Beale St. and from Broadway @ Sansome Sts.). The main building of the structure above the Embarcadero went on through 1957 to early 1959, and the entire structure was completed in April 1959. Later, in 1965, an on/off ramp was added connecting to Front St. @ Clay & Washington Sts. - this opened in Aug., 1965."
(Source: Northcoast707 on AAroads, 5/17/2019)

In 1968, Chapter 282 made a number of changes reflecting the reworking of the freeway plans in San Francisco. Two of these changes were of concern to Route 480. First, Route 280 moved off of Park Presidio/Veterans Blvd (signed as Route 1) to a new route (former Route 82) on the E side of I-80. In doing so, it gained the segment of Route 87 from Route 230 to Harrison Street (which is the street just N of I-80); the remainder of Route 87 (from Harrison Street to Route 480) became part of Route 480. This made the new version of Route 480: “Route 80 at the San Francisco-Oakland Bay Bridge approach in San Francisco to the junction of Route 280, Route 280 near Harrison Street in San Francisco to the junction of Route 1, Funston approach, and the approach to the Golden Gate Bridge in the Presidio of San Francisco passing near the intersection of Lombard Street and Van Ness Avenue.”

In 1991, SB 181, Chapter 498 deleted the remainder of Route 480, from Route 280 near Harrison Street in San Francisco to the junction of Route 1, Funston approach, and the approach to the Golden Gate Bridge. The portion from Marina Boulevard to the approach to the Golden Gate Bridge was transferred to Route 101. The last signs for the route were removed in 1997.

Why did these changes occur? In 1955, it was planned to have the US 101/I-480 interchange (and co-signing) begin approximately at the Lombard/Van Ness junction (where the Embarcadero and Central Freeways would have intersected)—this is illustrated in the 1955 Trafficways Map. By 1965, there was a new plan (which was reflected in the 1968 changes) to have a Central Freeway crosstown tunnel from Turk Street to Richardson Avenue, resulting in a much shorter multiplex of Route 480 and US 101 on Doyle Drive only—as illustrated in this 1965 Caltrans Map. This is why it was Route 480 (not US 101) on Doyle Drive (for US 101 exited on Richardson and presumably to the crosstown tunnel).

This route was intended to provide a freeway connection between the Golden Gate and Bay bridges in San Francisco. It was a double-deck roadway design. Calls for the Embarcadero Freeway’s demolition rang out even before the first stretch opened in 1959. The SF Chronicle was against the freeway from the beginning. An editorial from Nov. 22, 1955, included two photos of a huge roadway in Seattle “to show San Franciscans what a double-decker freeway looks like, so that they can intelligently calculate the aesthetic price as they debate this and future freeway construction.” After its debut, the freeway was assailed in another Chronicle editorial, this one from Aug. 28, 1959. The headline: “The boobery goes on and on.” That gem provided a clear view of the piece’s thrust: “We oppose and have consistently opposed the hideous monstrosity which the State Highway Commission built along the Embarcadero in front of the Ferry Building, obscuring the tower and the World Trade Center from view. ... Such an evil is the Embarcadero Freeway, which as we said last Friday and here repeat, should be demolished.”

The history of the construction of the Central Freeway through Hayes Valley -- and the controvery associated with it -- is discussed in "The Birth And Life Of The Freeway In Hayes Valley". This also includes a discussion of the Embarcadero Freeway.

The demolition of the freeway was put to a vote in 1986, but San Francisco voters defeated the two ballot propositions to start the tear-down. The measures lost by large margins and were major setbacks for both Mayor Dianne Feinstein and the city’s environmental groups.

On Oct. 17, 1989, the Loma Prieta earthquake struck, severely damaging the freeway. On Jan. 10, 1990, engineers hired by the state said it would cost between $14 million and $15 million to make the structure sturdier than it was before the quake and that the work would take about four months — quicker than expected. A heated discussion continued, until finally, on Jan. 2, 1991, Caltrans engineers conceded what local leaders had been saying all along: fixing the Embarcadero Freeway would be nearly as expensive as rebuilding it from scratch. This renewed assessment cleared the way for the demolition. A gigantic battering ram knocked loose a chunk of the freeway on Feb. 27, 1991, marking the beginning of the end for route.
(Source for some of the above: SF Chronicle, "An Ode to the Embarcadero Freeway, the Blight by the Bay", 8/1/2017)

The route, essentially, was doomed from the start, especially after January 1959 when the San Francisco Board of Supervisors Resolution 45-59 passed, which indicated opposition to certain freeway routes. Route 480 is one of the freeways opposed by the city; and was never included in the California Freeway and Expressway System, although it was a part of the Interstate system.

The Embarcadero Freeway (Route 480) ran north along the waterfront for nearly a mile, two thick lines of concrete 70 feet high and 52 feet wide. It started at Folsom Street and ended bluntly at Broadway, running right in front of the historic Ferry Building. The freeway was designed to make a turn inland and head west past Aquatic Park, all the way to the Golden Gate Bridge.

Several days after the 1989 Loma Prieta earthquake closed the highway, the executive director of the California Seismic Safety Commission inspected the freeway. There were deep diagonal cracks in half of the pillars just below the structure’s second deck. Those who wanted to get rid of the eyesore saw an opportunity. But neighborhood activists and business owners from Chinatown, North Beach and Fisherman’s Wharf worried that without a quick fix to the freeway, their businesses would be in peril. Mayor Art Agnos stayed neutral at first, until he warmed to a plan to replace the freeway with a sunken roadway, a project that would take an estimated four years to complete. Business groups were alarmed — they didn’t want to wait that long. Rose Pak, a forceful Chinatown community leader, led the charge from that community to try to get the freeway rebuilt quickly. Protests weren't enough — the Board of Supervisors voted 6-5 to demolish the freeway, if federal funds could not be found for its replacement. It wasn’t long before the plan shifted to just getting the damaged ghost highway down as fast as possible — and even some business groups started to agree. The demolition crews began setting up in early 1991. The last days of the Embarcadero Freeway “served as a giant beer garden with a spectacular view”. Drawn by the wonderful views and easily scalable fence, the empty freeway became a draw for barbecues and potluck dinners, a makeshift roller-skating track, a refuge for the homeless and a drinking spot for all types. The demolition kickoff was a big party. A group of Ethel Merman look-alikes sang a version of “Shake, Rattle and Roll,” presumably in honor of the earthquake. A Dixieland band wearing hard hats performed underneath the structure. Commemorative posters marking the freeway’s demolition were sold for $10.
(Source: SF Chronicle "Vault", 2/6/2019)

In 1998, there were brief plans to rebuild the Embacadero Freeway as a brief cut and cover tunnel. The proposal was to only extend to roughtly the point of where the elvated freeway structure was truncated.

The history of the route is fascinating; read the planning studies in the LINKS section for details. There were some plans to build it as a tube in the bay, or as a very narrow depressed highway, where there was little or no clearance to construct the road.

Some folks claim to have seen maps where I-480 looped around San Francisco after the Golden Gate Bridge, running S as the Park Presidio and Junipero Serra Freeways. This is unlikely. It is more likely that those freeways were to have been signed as part of Route 1. Note: According to Caltrans, Park-Presidio Boulevard possesses all the attributes of a freeway and was the first such thoroughfare in northern California. It was built through the Presidio of San Francisco as an approach to the Golden Gate Bridge.

Pre 1964 Signage History Pre 1964 Signage History

Route 480 was LRN 224, defined in 1947.

Tom Fearer provides some additional history: The Embarcadero Freeway was planned to connect the western approach of the Bay Bridge to US 101 at Lombard Street and Van Ness Avenue. This projected alignment of LRN 224 would have required tunneling through the massive Russian Hill on Lombard Street to reach US 101. The projected path of the Embarcadero Freeway first appears on the 1948 State Highway Map City Insert. On the 1958 State Highway Map the first segment of the Embarcadero Freeway is shown connecting from the western approach of the Bay Bridge to the Embarcadero near Howard Street. The double decker portion of the Embarcadero Freeway began near Fremont Street. On the 1960 State Highway Map the Embarcadeo Freeway is shown extended to Broadway from the western approach of the Bay Bridge. The projected path of LRN 253 appears on the State Highway Map connecting from US 101 north to the Embarcadero Freeway underneath the Bay Bridge. On the East Side of San Francisco Bay the planned route of LRN 257 is seen connecting the eastern approach span of the Bay Bridge.
(Source: Gribblenation Blog The Embarcadero and history of Interstate 480/California State Route 480 on the Embarcadero Freeway)

Status Status

Although the route no longer exists, the CalTrans bridge log for a time indicated that the route is signed as US 101 between post mile 2.85 and post 5.48. The Fremont St. exit off I-80 W is the former CA 480 exit. There is also a sealed-off CA 480 exit off of I-80 E.

As for what happened to what remains of the old Route 480... it is becoming a farm. Specifically, at the old on/off ramp near Laguna Street in early 2010, a number of urban farmers spread steaming piles of mulch over the edge of the ramps formerly used by cars to enter and exit the elevated Central Freeway spur above Octavia Street, arranging the soil in rows for planting vegetables and filler crops. This has formed the "Hayes Valley Farm".
(Source: SF.Streetsblog.Org, 2/8/2010)

Naming Naming

"Golden Gate" Freeway, Embarcadero Freeway.

Interstate Submissions Interstate Submissions

Interstate Shield Route 480 was approved as chargeable interstate sometime pre-1965; it was deleted as a chargeable route in August 1965 (hence, its signage after that date with a state shield (Route 480), as opposed to an interstate shield). The old Route 480 was demolished between 1991 and 1993.

This route was first proposed as I-110. After 3di numbering conventions were developed, this was proposed as I-380. AASHTO finally approved it as I-480.

Other WWW Links Other WWW Links

Scenic Route Scenic Route

[SHC 263.1] Originally, the entire route. Since deleted.


Acronyms and Explanations:


Back Arrow Route 466 Forward Arrow Route 505