🛣 Changes to the California Highways Web Site covering January-May 2021

What a long, strange year it has been. In March 2020, I saw my last live theatre for over a year: Passion at Boston Court. I had just returned from a trip to Madison WI to visit my daughter. We were just starting to worry about the Novel Coronavirus, with no idea of the long haul in front of us. Working from home had just begun. We were at the start of the 2020 election year, long before we had any inkling that the losing candidate would attempt an insurrection to overturn the election result and present Congress from doing their congressional duty. A long, long, strange year.

On the highway page front: I was continuing work on the major site redesign and rework, which was coming up in May. That behind me, updates preceded apace. I think the new site is fast. This year, due to some problems, I got rid of one of the plugins on the WordPress side of the site, and suddenly that became faster and more reliable. I may be getting back into the blogging side of the equation.

As for 2021: Let’s hope for a return to the new normal. We have a vaccine, and hopefully we’ll all be vaccinated by the summer—and so we might start to be able to do events and roadtrips again. We’ll likely still want to wear masks, as there will be those who refuse the vaccines, or for whom the vaccine is not 100% preventative. We have a new President, who is behaving a lot more…presidential. I don’t have major site changes planned. The hope for 2021 is: a new normal, and an uneventful new normal.  כן יהי רצון Ken Yehi Ratzon—Let It Be So.

I do want to share one thing I saw going through the CTC Minutes that didn’t make it into these pages. The following was amended into the SHOPP at the May meeting, and is $730,000 of your tax dollars at work:

May 2021 CTC Agenda Item 2.1a.(1a): 05-Mon-1 PM 10.5. Route 1 Near Gorda, at the Willow Springs Maintenance Station at 72115 Cabrillo Highway (Route 1). Repair failed electrical system. In January 2021, a microwave oven caught fire while not in use at the maintenance station employee housing facility.  A follow-up investigation of this incident, an ongoing low-voltage issue, and a history of damaged electrical appliances has identified numerous safety related issues due to undersized wiring, corrosion of components, long undersized wire runs, and all power runs connected to a ineffective single main breaker. This project will remove existing electrical components, install new pull boxes, conduit, wiring, and service panels.

On to the updates.

Updates were made to the following highways, based on my reading of the papers from January through May 2021 (which are posted to the roadgeeking category at the “Observations Along The Road” and to the California Highways Facebook group) as well as any backed up email changes. I also reviewed the the AAroads forum (Ꜳ). This resulted in changes on the following routes, with credit as indicated [my research(ℱ), contributions of information or leads (via direct mail or ꜲRoads) from Ꜳ GaryA(2), Michael Ballard(3)Ꜳ Bing101(4), Shirleigh Brannon(5)Ꜳ DT Composer(6), Tom Fearer(7)Ꜳ HeyNow415(8), Cameron Kaiser(9), Rick Kelly(10)Ꜳ Kniwt(11), Scott Parker(12),  Francesca Smith(13), Chris Sampang(14), and Joel Windmiller(15): Route 1(ℱ,7,12), Route 4(7), I-5(ℱ), I-8(ℱ), Route 9(ℱ), I-10(ℱ), Route 12(ℱ), Route 13(7), I-15(ℱ,7,12), Route 16(7), Route 20(7), Route 24(7,11), Route 25(ℱ), Route 29(ℱ), Route 37(ℱ), I-40(7), US 40(ℱ,8), Route 41(ℱ), Route 42(ℱ),  Route 46(ℱ), Route 47(ℱ), US 48(10), Route 49(ℱ), US 50(ℱ,7,15), Route 55(ℱ), Route 57(ℱ), Route 62(ℱ), Route 67(ℱ),  Route 70(ℱ),  Route 74(ℱ), Route 75(ℱ), Route 78(ℱ), Route 79(ℱ), I-80(ℱ), Route 84(ℱ), Route 86(ℱ), Route 90(ℱ), US 91/ Route 91(ℱ,7,12), Route 92(ℱ), Route 99/US 99(ℱ,3,7,15), US 101(ℱ,2,7,12,6), I-105(ℱ,13), Route 108(ℱ), Route 111(ℱ), Route 118(ℱ), Route 120(ℱ), Route 123(4), LRN 125(7), Route 128(ℱ,7,8), Route 132(ℱ), Route 134(ℱ), Route 135(ℱ), Route 136(9),  Route 138(ℱ), Route 140(ℱ), Route 143(ℱ), Route 148(ℱ), Route 152(7,14), Route 154(ℱ), LRN 174(ℱ), Route 174(ℱ), Route 198(7), Route 204(7), I-210(ℱ), Route 222(ℱ,7), Route 229(7), Route 236(ℱ), Route 241(ℱ), Route 254(ℱ), Route 263(ℱ),  I-280(ℱ), Route 282(ℱ), I-305(ℱ,7), Route 371(ℱ), I-380(ℱ), US 399(7),  I-405(ℱ), US 466(7,12), I-505(ℱ), I-580(ℱ), I-605(ℱ), I-680(ℱ), I-710(ℱ), I-980(ℱ), County Sign Route G8(7) .
(Source: private email, Highway headline posts through May 2021 as indicated, AARoads through 5/28/2021)

For those interested, there is an interview with me in Caltrans News 2021 № 1.

At the request of a long-time friend and contributor to this site(5), captured the “lost” Caltrans series of pages about the 50th Anniversary of the start of the Interstate system that occurred in 2005/2006. These pages were published on the Caltrans site in 2005, and disappeared during a site rework in 2019 (likely because they were felt to be outdated). But for those of us here at California Highways, we love that history—and so we have preserved them. Please contact Caltrans if you want to use the pictures, and say you saw it on the Wayback Machine (wink).

Added some information on the earliest days of this website to the 1996 and before changes page. Ronald J Hall at Caltrans sent me a correction for the statistics page regarding the highest point on Route 270.

Reviewed the Pending Legislation page, based on the new California Legislature site. As usual, I recommend to every Californian that they visit the legislative website regularly and see what their legis-critters are doing. As many people are unfamiliar with how the legislature operates (and why there are so many “non-substantive changes” and “gut and amend” bills), I’ve added the legislative calendar to the end of the Pending Legislation page. A new legislative session started after the November elections; all of the 2019-2020 bills are dead. So far, it is way too early for any bills to have made it out of their house of origin into the other house, let alone to the Governor’s desk.

I checked California Transportation Commission page for the results of the California Transportation Commission meetings from January through May 2021. As always, note that I tend not to track items that do not impact these pages — i.e., pavement rehabilitation or replacement, landscaping, drainage, culverts, roadside facilities, charging stations, or other things that do not impact the routing or history, unless they are really significant. As such, the following items were of interest:

[ Note: ° indicates items that were below the level of detail for updating the specific route pages; ♠ is an indicator used to keep track of what has been added to the pages; ❧  indicates the results from the meeting, if the meeting minutes were available. ]

2.1a. STIP/SHOPP Program/Project Amendments

♠ (Jan) (1) SHOPP Amendments for Approval: Request to: ❧ Approved as revised 
(Related Items under Ref. 2.5b.(1), 2.5b.(2) and 2.5b.(3))

  • Add 20 new projects into the 2020 SHOPP.  (2.1a.(1a))
  • Revise 17 projects currently programmed in the 2020 SHOPP.  (2.1a.(1d))

Of these, the following projects/allocation were at the level of interest for the highway pages (general, these are significant new structures or changes, as opposed to repair or rehabilitation in place; additions of bike paths, pedestrian, or complete street elements; or non-visible changes):

  • (1a) #11: 03-Sut-99 T35.8/36.4 PPNO 8385 ProjID 0320000040 EA 0J910. Route 99 near Live Oak, from 0.2 mile south of Encinal Road/Live Oak Boulevard to 0.1 mile north of Kent Avenue; also from 0.1 mile south to 0.1 mile north of Eager Road (PM R33.8/R34.0). Eliminate direct access to Route 99 from Encinal Road/Live Oak Boulevard and improve the intersection of Live Oak Boulevard and Eager Road to enhance access to Route 99 at the Eager Road interchange. PA&ED $1,160K; PS&E $1,380K; R/W Sup $430K; Con Sup $850K; R/W Cap $690K; Const Cap $7,800K; TOTAL $12,310K. Begin Const 8/1/2024.
  • (1a) #14: 06-Ker-43 15.6/16.0 PPNO 7044 ProjID 0620000038 EA 1A470 Route 43 in Shafter, at the intersection with Santa Fe Way and Los Angeles Street. Construct roundabout. PA&ED $1,200K; PS&E $2,000K; R/W Sup $950K; Con Sup $1,900K; R/W Cap $1,502K; Const Cap $6,065K; TOTAL $13,617K. Begin Const 1/6/2025.
  • (1a) #15 10-Mer-152 R10.1/13.848 PPNO 3505 ProjID 1020000085 EA 1L630. Route 152 near Los Banos, from 0.8 mile west Basalt Road to Route 5. Construct median barrier. PA&ED $1,010K; PS&E $1,070K; R/W Sup $138K; Con Sup $1,130K; R/W Cap $110K; Const Cap $6,407K TOTAL $9,865K. Begin const. 10/28/2024.
  • (1a) #16 10-SJ-4 20.5/20.9 PPNO 3492 ProjID 1020000103 EA 1L280. Route 4 Near Stockton, from east of Del Rey Court to east of South Walker Lane.  Widen highway and construct a channelized left-turn lane.PA&ED $847K; PS&E $1,305K; R/W Sup $431K; Con Sup $820K; R/W Cap $261K; Const Cap $2,429K TOTAL $6,093K. Begin const. 1/17/2025 .
  • (1b) #6-8. 04-Son-1 15.1/15.7 PPNO 0748E ProjID 0400000129 EA 0A020. Route 1 Near Carmet, from 0.1 mile to 0.7 mile north of Calle Del Sol. Realign roadway near Gleason Beach. Funding adjustments. (Concurrent CONST and CON ENG allocation under Resolution FP-20-43; January 2021.) The amendment also split project EA 0A020/PPNO 04-0748E into biological mitigation project EA 0A021/PPNO 04-0748R and a stormwater mitigation project EA 0A022/PPNO 04-0748S.
  • (1b) #10. 05-Mon-68 3.4/3.8 PPNO 2742 ProjID 0517000113 EA 1J460. Route 68 Near Pacific Grove, from Skyline Forest Drive to west of Route 1; also from Haul Road to west of Skyline Forest Drive (PM 2.7/3.2). Increase safety by improving roadway cross slope at curve, sight distance, widen shoulders, install rumble strip, tapered edge treatment and construct drainage improvements. It has been determined that construction of a planned retaining wall will not be needed.  This change resulted in a decrease to construction support with less working days, a decrease in required right of way capital, and a decrease in construction capital.
  • (1b) #11. 05-SB-217 0.9/1.4 PPNO 2386 ProjID 0512000134 EA 1C360. Route 217 Near Goleta, from 0.1 mile south to 0.4 mile north of San Jose Creek Bridge No. 51-0217.  Replace bridge. Amended to increase R/W capital due to a need for offsite mitigation to meet permit requirements and an increase in the number of utilities needing relocation.
  • (1b) #12. 07-LA-110 25.8/30.6 PPNO 5083 ProjID 0716000231 EA 33150. Route 110 In the city of Los Angeles and South Pasadena, between Figueroa Street and Orange Grove Avenue. Convert outside lane to a dynamic lane/shoulder that can switch between the two depending on prevailing traffic conditions. This will require Dynamic Message Signs (DMS) monitored by the Transportation Management Center (TMC). The amendment unprogramed (i.e., zeroed out) PS&E, R/W, and construction phases.  Due to community input, additional alternatives will be considered as part of the environmental process. The remainder of the project will be re-programmed at completion of the environmental document.
  • (1b) #13. 08-Riv-10 R60.9/R74.0 R60.7/R74.3 PPNO 3008A ProjID 0816000086 EA 1C081. I-10 in and near Coachella, from 0.5 0.3 mile east of Coachella Canal to 0.2 mile east of Hazy Gulch Bridge. Cold plane pavement and overlay with Portland Cement Concrete (PCC).  Construct eastbound truck climbing lane.  A one lane temporary detour will be constructed in the median for traffic handling. Amended to change postmiles to accommodate transition tapers and signage. Increase R/W capital from $10K to $13,991K for mitigation related to usage of the median for traffic staging, which impacts desert tortoise habitat, permit fees, application fees, and mitigation related to bridge widening.  Revised total is now $210,081K.

♠ (Jan) (2) STIP Amendment for Action: The Department proposes to amend the Route 138 Widen Conventional Highway (Segment 4) project (PPNO 4353) to delay construction by one year from Fiscal Year 2021-22 to 2022-23, in Los Angeles County. STIP Amendment 20S-04 ❧ Approved

♠ (Mar) (1) SHOPP Amendments for Approval: Request to: ❧ Approved as revised
(Related Item under Ref. 2.5b.(2a) – 2.5b.(2b)

  • Add 21 new projects into the 2020 SHOPP.  (2.1a.(1a) and 2.1a.(1c) (Long Lead))
  • Revise 45 projects currently programmed in the 2020 SHOPP.  (2.1a.(1d) and 2.1a.(1e))

Of these, the following projects/allocation were at the level of interest for the highway pages (general, these are significant new structures or changes, as opposed to repair or rehabilitation in place; additions of bike paths, pedestrian, or complete street elements; or non-visible changes):

  • (1a) #11. 01-Hum-101 125.2/125.6 PPNO 2536 ProjID 0120000035 EA 0K150. US 101 Near Orick, from 0.9 mile south to 0.5 mile south of South Prairie Creek Park Undercrossing.  Improve curves and roadway cross slope, widen shoulders,and improve drainage. PA&ED $1,777K; PS&E $1,928K; R/W Sup $224K; Con Sup $2,826K; R/W Cap $1,035K; Const Cap $5,663K TOTAL $13,453K. Begin const. 8/27/2024.
  • (1a) #13. 01-Men-101 30.8/R33.8 PPNO 4751 ProjID 0120000062 EA 0K310. US 101 Near Ukiah, from Route 20 to 0.1 mile south of Uva Drive/North State Street. Construct median barrier. PA&ED $682K; PS&E $941K; R/W Sup $66K; Con Sup $1,028K; R/W Cap $28K; Const Cap $6,312K TOTAL $9,057K. Begin const. 7/5/2023.
  • (1a) #17. 10-Mer-140 43.5/43.9 PPNO 3506 ProjID 1020000188 EA 1M170. Route 140 Near Planada, from west of Plainsburg Road to Sutter Street.  Intersection improvements. PA&ED $1,090K; PS&E $1,530K; R/W Sup $410K; Con Sup $1,450K; R/W Cap $2,760K; Const Cap $4,520K TOTAL $11,760K. Begin const. 12/27/2024.
  • (1c) #1. 01-Hum-299 R8.0/R8.8 PPNO 2535 ProjID 0120000032 EA 0J801. Route 299 Near Blue Lake, from 0.9 mile east to 1.7 miles east of Blue Lake Boulevard.  Restore storm damaged roadway by relocating on a new alignment and construct retaining wall. (Long Lead Project) PA&ED $2,171K; ⊘PS&E $1,989K; ⊘R/W Sup $168K; ⊘Con Sup $4,668K; ⊘R/W Cap $993K; ⊘Const Cap $49,684K TOTAL $59,673K. “⊘” indicates phase not programmed. Begin const. 3/19/2025. Note: Complex and lengthy geotechnical investigations are required to evaluate various landslide repair solutions.
  • (1d) #2. 01-Hum-101 88.3/88.6 PPNO 2424 ProjID 0115000043 EA 0E890. US 101 In Arcata, from north of Route 299/Route 101 Connector to 0.2 mile south of Giuntoli Lane Overcrossing. Construct auxiliary lane to improve merging movements. Amended to increase construction capital, R/W capital, and to delay completion. Increase in construction capital from $4,098K to $5,042K is due to the addition of maintenance vehicle pullouts, security fencing, rock slope protection, enhanced structural section, and aerially deposited lead material removal. Increase in R/W capital from $523K to $709K is due to the temporary construction easements required in order to remove old fencing and constructing new fence. Revised total: 9,724K Delay of project by one year to FY22-23 will avoid traffic handling conflicts with an adjacent project.
  • (1d) #6. 03-Nev-80 13.0/15.5 13.04/16.5 PPNO 4294 ProjID 0316000064 EA 1H180. I-80 In Truckee, from west of Donner Pass Road Overcrossing to Bridge Street Undercrossing Route 80/Route 89/Route 267 Separation (PM 13.04/15.5). Rehabilitate roadway, construct auxiliary lane, upgrade Transportation Management System (TMS) elements, rehabilitate drainage systems, and upgrade facilities to Americans with Disabilities Act (ADA) standards. This project was amended to combine it with project EA 1H181/PPNO 03-4318 to improve construction efficiencies and reduce impact to traveling public, resulting in updates to postmiles, description and schedule. Increase construction capital from $15,600K to $20,430K to address work required on the inside shoulders, additional slab replacement, and rut repair. Update performance due to change in methodology to count only the slabs being repaired instead of total project lane miles.
  • (1d) #8. 03-Sac-51 2.0/3.5 PPNO 6402 ProjID 0312000054 EA 3F070. Route 51 (Business Route 80) In the city of Sacramento, at the American River Bridge No. 24-0003 from north of B Street Underpass to north of Exposition Boulevard Overcrossing, at the American River Bridge No. 24-0003 and Cal Expo Undercrossing No. 24-0133.  Widen and replace bridge deck.  This is a Construction Manager/General Contractor (CMGC) project. This project was amended to adjust the description and funding. Increase R/W capital from $2,000K to $10,900K due to increased mitigation costs for work within the American River channel and parkway. Increase construction capital from $123,000K to $135,000K due to additional foundation and scour prevention work, roadway and bridge widening for stage construction, and widening at Cal Expo Undercrossing (UC) to accommodate lane tapers. Construction support has decreased from $22,000K to $19,000K. Update performance to include widening at Cal Expo UC. Delays in PA&ED has resulted in delays to the overall schedule shifting completion to FY23-24.
  • (1d) #15. 04-Nap-128 5.1 PPNO 1451C ProjID 0416000038 EA 4J830. Route 128 Near Rutherford, at Hopper Slough Bridge No. 21-0019. Replace bridge. This project was amended to adjust costs. Increase in construction support (from $2,014K to $3,900K) and capital (from $7,864K to $12,200K) is due to significant design change from a single-span to a three- span bridge with a longer structure and changed foundation type to address poor soil conditions. The proposed changes require additional environmental work, delaying the completion of PA&ED phase, thus delaying the project delivery. Revised total: $21,882K. Revised completion: FY23-24.
  • (1d) #32. 07-LA-110 31.0/31.0 PPNO 5196 ProjID 0716000355 EA 33520In Pasadena and South Pasadena, at the Fair Oaks Avenue northbound offramp. Widen ramp from two lanes to four lanes.  The city of South Pasadena will Advertise, Award, and Administer (AAA) the project construction contract. Amend to delete project.  This project was programmed to mitigate risk in the event that an adjacent Route 710 project EA 02009/PPNO 07-0219M could not environmentally clear this location. The Route 710 project completed PA&ED, so this project is no longer needed.

♠ (Mar) (2) STIP Amendment for Action: The Contra Costa Transportation Authority proposes to delete the I-80/San Pablo Dam Interchange – Phase 2 (R/W only) project (PPNO 0242K) and reprogram those STIP funds to a new project – Bollinger Canyon Road Iron Horse Trail Bike and Pedestrian Overcrossing project, in Contra Costa County. (PPNO 0242M)  ❧ Approved

♠ (May) (1) SHOPP Amendments for Approval:  Request to:  ❧ Minutes with vote results not available
(Related items under Ref. 2.5b.(1), 2.5b.(2) and 2.5d.(1))

  • Add 26 new projects into the 2020 SHOPP.  (2.1a.(1a))
  • Revise 58 projects currently programmed in the 2020 SHOPP.  (2.1a.(1d) & 2.1a.(1f))
  • Develop 1 Long Lead projects.  (2.1a.(1c)) SHOPP Amendment 20H-007

Of these, the following projects/allocation were at the level of interest for the highway pages (general, these are significant new structures or changes, as opposed to repair or rehabilitation in place; additions of bike paths, pedestrian, or complete street elements; or non-visible changes):

  • (1a) #14. 05-Mon-1 29.6/36.8 PPNO 3041 ProjID 0521000015 EA 1N410. Route 1 Near Big Sur, from 1.5 miles north of Big Creek Bridge to 0.6 mile north of Julia Via Bridge; also from 0.9 mile to 0.5 mile south of Big Creek Bridge (PM 27.2/27.6).   Repair roadway washout, remove debris, and repair culverts. Note: Heavy rainfall on January 27-28, 2021 caused large debris flows and a major washout at Rat Creek. The larger than normal debris flow is due to the Dolan Fire that burned over 128,000 acres in August 2020.  The high intensity storms  combined with fire damage debris lead to a blocked existing sixty-six inch drainage pipe that conveyed the flow under the embankment.  Runoff began to pond behind the roadway embankment until it overtopped the highway.  Resulting drainage water overtopping eroded the fill on the downstream side, and eventually eroded across both lanes.  This project will clear mud and debris, clear culvert inlets in the area, and place an enhanced embankment solution and pavement to restore the eroded roadway.  PA&ED $0K; PS&E $600K; R/W Sup $400K; Con Sup $2,000K; R/W Cap $400K; Const Cap $11,200K TOTAL $14,600K.
  • (1a) #21. 01-Men-101 41.2/R42.8 PPNO 4752 ProjID 0120000081 EA 0K410. US 101 Near Willits, from north of Black Bart Road to north of Waterplant/Grider Road.   Construct concrete median barrier and retaining wall, upgrade guardrail, and make intersection improvements. (Concurrent COS allocation under Resolution FP-20-70; May 2021.)  PA&ED $1,719K; PS&E $2,489K; R/W Sup $194K; Con Sup $1,789K; R/W Cap $61K; Const Cap $10,658K TOTAL $16,910K. Begin const. 7/2/2024.
  • (1a) #25. 10-Mer-99 0.4/R12.7 PPNO 3510 ProjID 1020000183 EA 1L310. Route 99 In and near the city of Merced, from north of the Madera County line to south of East Childs Avenue. Construct median barrier. (Concurrent COS allocation under Resolution FP-20-70; May 2021.) PA&ED $894K; PS&E $1,384K; R/W Sup $51K; Con Sup $1,856K; R/W Cap $23K; Const Cap $13,399K TOTAL $17,607K. Begin const. 4/19/2024.
  • (1c) #1. 12-Ora-5 R29.1/44.382 PPNO 2833C ProjID 1218000006 EA 0Q950. I-5 In and near the cities of Tustin, Orange, Santa Ana, Anaheim, Fullerton, and Buena Park, from Red Hill Avenue to the Los Angeles County line.  Address High Occupancy Vehicle (HOV) lane degradation.  (Additional $2,200,000 from Interregional Improvement Program (IIP) contribution.) (Long Lead Project). PA&ED $12,800K only. Begin const: 2/16/2028.
  • (1d) #8. 03-Sac-51 2.0/3.5 PPNO 6402 ProjID 0312000054 EA 3F070. Route 51 (Business Route 80) In the city of Sacramento, from north of B Street Underpass to north of Exposition Boulevard Overcrossing at the American River Bridge No. 24-0003 and Cal Expo Undercrossing No. 24-0133. Widen and replace bridge deck and construct 0.14 mile of Class 1 bike and pedestrian path as a complete streets element. This is a Construction Manager/General Contractor (CMGC) project. (Additional $2,700,000 contribution for Const Cap from the city of Sacramento.) This was amended to add the bike path and to adjust costs. Increase in construction capital from $135,000K to $139,300K is due to the addition of 0.14 mile of Class 1 bike and pedestrian path as complete streets element.  The Complete Streets cost increase is $4,300,000. The decrease in R/W capital from $10,900K to $7,634K is due to a reduction of impacts to elderberry bushes and associated mitigation costs. Revised total: $182,874K. ⊘ Note: Const Sup and Construction Capital phases are not yet programmed.
  • (1d) #9. 04-Ala-13 6.7/7.2 PPNO 1490P ProjID 0415000356 EA 4J490. Route 13 In Oakland, from 0.2 mile north of Lincoln Avenue to 0.2 mile south of Park Boulevard.  Install outer separation barrier, and construct rumble strips. This was amended to adjust costs. During PA&ED, additional tree removal, moment slab barrier, pavement and excavation work were identified resulting in increased construction support ($565K → $1,062K) and capital costs ($2,895K → $5,344K). Revised total: $8,046K.
  • (1d) #25. 05-SB-101 21.4/21.9 PPNO 2649 ProjID 0516000073 EA 1H430. US 101 In Goleta, from Route 217 to 0.3 mile north of San Jose Creek Bridge No. 51-0163L/R.  Replace bridges. Amended to adjust cost. Increase in construction capital ($9,240K → $19,948K) is due to refinement of cost estimate which includes an increased amount of steel and concrete box girders in the bridges, drainage work, and erosion control, and an increased roadway estimate along with an added detour.  Increase in construction support ($3,480K → $3,801K) is due to the additional work previously mentioned increasing the working days from 220 to 650.  The increase in R/W Capital ($144K → $168K) is due to a revised R/W estimate.  Revised total: $28,117K.
  • (1d) #27. 05-SB-154 R2.6 PPNO 2391 ProjID 0512000139 EA 1C410. Route 154 Near Los Olivos, at Alamo Pintado Pedestrian Bridge No. 51-0076Y. Replace bridge. Amended to update costs. Increase in construction capital ($3,460K → $3,800K) is due to increases in costs for structure removal, historical preservation work, and bird netting. Increase in construction support ($1,450K → $1,810K) is due additional work increasing working days from 135 to 150. Revised total: $9,035K.
  • (1d) #28. 05-SCr-9 13.6, 15.5 PPNO 2655 ProjID 0516000078 EA 1H470. Route 9 Near Boulder Creek, at San Lorenzo River Bridge No. 36-0052 (PM 13.61) and Kings Creek Bridge No. 36-0054 (PM 15.49).  Replace bridges to maintain standards of safety and reliability. Amend to adjust costs. Increase construction capital ($11,928K → $16,165K) because of necessary additional roadway replacement, increased clearing and tree removal, a temporary creek diversion, and an increase in cast-in-drilled-hole piles. Revised total: $27,447K.
  • (1d) #48. 08-SBd-62 15.3/28.9 PPNO 3016T ProjID 0820000011 EA 1L290Route 62 In and near Yucca Valley and Twentynine Palms, from east of Yucca Mesa Road/La Contenta Road to Alfalfa Avenue/Sherman Road.  Restripe existing two-way left-turn lanes to painted median islands and install rumble strips. Amended to delete project. The scope of this project has been added to a maintenance project EA 08-1L670 which overlaps the postmile limits and construction schedule of this project.
  • (1d) #51. 09-Mno-395 58.2/60.2 58.2/60.4 PPNO 2624 ProjID 0916000006 EA 36640. US 395 Near Lee Vining, from Route 167 Junction to 0.2 0.4 mile north of Conway Ranch Road.  Widen shoulders, install shoulder rumble strip, correct compound curve, and improve chain control area. Amended to update description and postmiles to extend the project limits to correct an existing compound curve by removing and replacing striping.
  • (1d) #52. 10-Cal-4 16.1 15.9/16.3 PPNO 3255 ProjID 1017000154 EA 1H500. Route 4 Near Angels Camp, at West Branch Cherokee Creek Bridge No. 30-0036. Replace bridge. (Additional $300,000 for PS&E from local contribution.) Amended to adjust costs. There is an alignment conflict with the western segment of the planned Wagon Trail project 0E531/PPNO 10-3067A. Increase in construction capital ($4,200K → $5,786K) to revise the project scope to realign the bridge to connect to the approach and departure of the planned adjacent project alignment.  Revise project description and postmiles due to the change to the bridge alignment. Revised total: $9,664K.

♠ (May) (3) STIP Amendment for Action: The Department and Los Angeles County Metropolitan Transportation Authority proposes to amend the State Route 71 Expressway to Freeway Conversion project to delay construction by two years in Los Angeles County. (PPNO 2741N)  ❧ Minutes with vote results not available

♠ (May) (5)  STIP Amendment for Action: The Department proposes to program a new project – the I-5 Managed Lanes in Orange County (12-Ora-5 R29.1/44.382), for $2,200,000 in the 2020 STIP for PA&ED in FY 2021-22. (PPNO 2833C)  ❧ Minutes with vote results not available

2.1b. STIP Program/Project Amendments/Approvals for Notice

♠ (Jan) (1) STIP Amendments for Notice: The Contra Costa Transportation Authority proposes to delete the I-80/San Pablo Dam Interchange – Phase 2 (R/W only) project (PPNO 0242K) and reprogram those STIP funds to a new project – Bollinger Canyon Road Iron Horse Trail Bike and Pedestrian Overcrossing project (PPNO 0242M) in Contra Costa County. STIP Amendment 20S-05 ❧ Information Only

♠ (Mar) (2) STIP Amendment for Notice: The Department and Los Angeles County Metropolitan Transportation Authority proposes to amend the Route 71 Expressway to Freeway Conversion project to delay construction by two years in Los Angeles County. (PPNO 2741N)  ❧ Information Only

♠ (Mar) (3) STIP Amendment for Notice: The Riverside County Transportation Commission proposes to amend the 2020 STIP to program an AB 3090 reimbursement project (PPNO 0077M) in order to use local funds for construction of the Route 91/Route 71 Interchange and Connectors project (PPNO 0077G) in Riverside County, with reimbursement to be scheduled over a three-year period beginning in FY 2022-23.  ❧ Information Only

♠ (Mar) (4) STIP Amendment for Notice: The Department proposes to program $2,200,000 in Interregional Improvement Program shares to a new project – I-5 Managed Lanes in Orange County, for the Project Approval and Environmental Document phase in FY 2020-21. (PPNO 2833C) STIP Amendment 20S-09 ❧ Information Only

♠ (May) (1) STIP Amendment for Notice: The Santa Clara Valley Transportation Authority proposes to delete STIP construction funds from the US 101 Silicon Valley Express Lanes Program – Phase 5 Civil project (PPNO 2015H) and reprogram those funds to cover Right of Way and Construction funding shortfall for the I-280 Soundwalls – Route 87 to Los Gatos Creek project (PPNO 0503J) in Santa Clara County. ❧ Minutes with vote results not available

♠ (May) (3) STIP Amendment for Notice: The Alameda County Transportation Commission proposes to program $40,000,000 from future Regional Improvement Program (RIP) shares of Alameda County to Construction phase for the Interstate 680 Southbound Express Lane from State Route 84 to Alcosta Boulevard project (PPNO 2905F) in Alameda and Contra Costa Counties. ❧ Minutes with vote results not available

♠ (May) (4) STIP Amendment for Notice: The Solano Transportation Authority proposes to delete STIP construction funds from the Route 37 Fairgrounds Drive Interchange Improvement Project – Phase 1 project (PPNO 5201G) and reprogram those and additional STIP funds to cover the PS&E funding shortfall for the Westbound I-80 Cordelia Commercial Vehicle Enforcement Facility project (PPNO 8273C) project in Solano County. ❧ Minutes with vote results not available

♠ (May) (5) STIP Amendment for Notice: The Solano Transportation Authority proposes to delay Construction for the Route 12/Church Road Intersection Improvements project  in Solano County. (PPNO 2251A) ❧ Minutes with vote results not available

♠ (May) (10) STIP Amendment for Notice: Tehama County proposes to delay Construction for the 99W & Gyle Road to South Main Street and I-5 Overcrossing project  in Tehama County. (PPNO 2569)  ❧ Minutes with vote results not available

♠ (May) (12) STIP Amendment for Notice: The Department proposes to delay Construction for the Feather River Inn Intersection Improvement project on Route 70 in Plumas County. (PPNO 3703) ❧ Minutes with vote results not available

♠ (May) (15) STIP Amendment for Notice: Santa Barbara County and the Department propose to amend the funding and schedule for the South Coast US 101 High Occupancy Vehicles Lanes – Carpinteria (Segment 4A) Mitigation project in Santa Barbara County. (PPNO 7101X)  ❧ Minutes with vote results not available

♠ (May) (17) STIP Amendment for Notice Request to:  ❧ Minutes with vote results not available

  • Add 14 new projects to the 2021 Mid-Cycle STIP.
  • Increase funding or advance funding to 21 projects currently programmed in the 2020 STIP.

The following is the list of projects. However, the proposal did not give a lot of details — most notably, no postmiles — so I’m not putting these on the pages until the actual amendments show up at a future CTC meeting (Reminder: “°” indicates projects below the level of interest for the pages on this site):

  • Alameda:
    • Add New Project: Route 680 Southbound Express Lane from Route 84 to Alcosta Blvd Project (PPNO 2905F); program $5,792 to the CON capital phase in FY 2021-22.
    • Add New Project: Route 880 Oakland/Alameda Access, Broadway-Jackson, Improvement Project (PPNO 0044D); program $50 to the PS&E phase in FY 2022-23.
    • Add New Project: Route 80 Ashby Interchange Improvements Project (PPNO 0069V); program $50 to the PS&E phase in FY 2022-23.
    • Add New Project, Route 880 Interchanges Improvements, Whipple Road/Industrial Parkway Southwest & Industrial Parkway West Project (PPNO 0023L); program $50 to the PS&E phase in FY 2022-23.
    • Add New Project: Route 880 Interchanges Improvements, Winton Avenue and A Street Project (PPNO 0023M); program $50 to the PS&E phase in FY 2022-23.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 2179) by $315 for the CON phase in FY 2022-23.
  • Kern:
    • A° dd New Project: Hageman Road Extension and Flyover Project (PPNO 3525); program $2,686 to the R/W capital phase in FY 2022-23.
    • Add New Project: Route 58 Eastbound Truck Climbing Lane Project (PPNO 2664); program $2,272 to the PA&ED phase in FY 2021-22.
  • Los Angeles:
    • ° Increase funding to the East San Fernando Valley North-South Transit (D/B) Project (PPNO 4296) by $38,189 for the R/W phase in FY 2021-22.
  • Madera:
    • Increase funding to the Route 99 South Madera 6-Lane Widening Project (PPNO 6297) by $230 for the R/W Support phase and $602 for the R/W capital phase in FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 6L05) by $44 for the CON phase in FY 2021-22.
  • Marin:
    • Add New Project: Route 101 Marin-Sonoma Narrows, Segment B7 Project (PPNO 0361M); program $1,122 to the CON capital phase in FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 2127C) by$59 for the CON phase in FY 2021-22.
  • Modoc:
    • ° Increase funding to the County Road 55 (Hilltop Lane), US 395-County Road 247A (Steelhead Ln) Rehabilitation Project (PPNO 2438) by $35 for the PS&E phase in FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 2051) by $22 for the CON capital phase in FY 2022-23.
  • Mono:
    • ° Add New Project: Main Street Multi-Use Path Project (PPNO 2683); program $250 to the PS&E phase in FY 2021-22.
    • ° Add New Project: Minaret Road Multi-Use Path Project (PPNO 2681); program $250 to the PS&E phase in FY 2021-22.
    • ° Add New Project: Laurel Mountain Road Rehab and Sidewalks Project (PPNO 2682); program $141 to the PS&E phase in FY 2021-22, and $664 for the CON phase in FY 2022-23.
  • Monterey:
    • Increase funding and Decrease Local Funding: Castroville Boulevard Interchange Project (PPNO 0057D), Increase funding by $2,136 in the CON capital phase in FY 2021-22. Decrease local funding by $2,136 in the CON capital phase in FY 2021-22
    • ° Increase funding to Planning Programming and Monitoring (PPNO 1165) by $113 for the CON capital phase in FY 2021-22.
  • Napa:
    • Increase funding to the Route 12/29/221 Soscol Junction Intersection Separation Project (PPNO 0376) by $739 to the CON Support phase in FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 1003E) by $39 for the CON phase in FY 2021-22.
  • Orange:
    • Advance $800 in PS&E phase funding for the Route 74 (Ortega Highway) Calle Entradero-City/County Line Project (PPNO 4110) from FY 2024-25 to FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 2132) by $589 in the CON phase by FY 2021-22.
  • Sacramento:
    • Add New Project: Route 5 Managed Lanes, Route 50 to Sacramento River Bridge Project (PPNO 5860); program $3,700 to the PA&ED phase in FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 0L30) by $298 for the CON phase in FY 2021-22.
  • San Francisco:
    • ° Add New Project: SF MTA Folsom Street Streetscape Improvements Project (PPNO 2532); program $3,043 to the CON phase in FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 2007) by $160 for the CON phase in FY 2021-22.
  • Solano:
    • Increase funding to the Solano Route 80 Managed Lanes Project (PPNO 0658L) by $1,859, CON capital phase, FY 2021-22.
    • ° Increase funding to Planning Programming and Monitoring (PPNO 2263) by $98 for the CON phase in FY 2023-24.
  • Sonoma:
    • ° Increase funding to Planning Programming and Monitoring (PPNO 0770E) by $120 for the CON phase in FY 2021-22.
  • Sutter:
    • ° Increase funding to Planning Programming and Monitoring (PPNO 1L53) by $28 for the CON phase in FY 2021-22.
  • Yolo:
    • Add New Project: Yolo Route 80 Managed Lanes Project (PPNO 8922); program $4,000 to the PA&ED phase in FY 2021-22.
    • ° Increase Funding to Planning Programming and Monitoring (PPNO 0L37) by $58 for the CON phase in FY 2021-22.
  • Yuba:
    • ° Increase Funding to Planning Programming and Monitoring (PPNO 0L41) by $21 for the CON phase in FY 2021-22.

2.1c. TCIF Baseline Amendments

There were no items of interest for this agenda item in the reviewed minutes.

2.1s. TCEP Baseline Amendments

There were no items of interest for this agenda item in the reviewed minutes.

2.2a. Submittal of Notice of Preparation for Comments

There were no items of interest for this agenda item in the reviewed minutes.

2.2b. Submittal of Notice of Documents Available for Comment (DEIRs)

There were no items of interest for this agenda item in the reviewed minutes.

2.2c. Approval of Projects for New Public Road Connection / Future Consideration of Funding

♠  (Jan) (1) Approval of Projects for Future Consideration of Funding: ❧ Approved
(“°” indicates projects below the level of interest for the pages on this site)

  • 01-Men-162, PM 8.2. South Eel River Seismic Project. Seismically upgrade South Eel River Bridge on Route 162 in Mendocino County. (MND) (PPNO 4692) (SHOPP)
  • 01-Hum-101, PM 88.3. 01-Hum-299, PM 0.0 Arcata 101 Merge Improvement Project. Extend the Route 299 entrance ramp onto northbound US 101 to the Giuntoli Lane exit ramp in Humboldt County. (ND) (PPNO 2424) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 03-But-70, PM 46.0/47.0. Pulga Profile Change Project. Raise existing roadway profile approximately 5 feet on Route 70 in Butte County. (MND) (PPNO 2293) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 03-Col-20, PM 34.8/36.5. Colusa Shoulder Widening & Clear Recovery Zone. Install standard 8-foot shoulders, provide a 20-foot Clear Recovery Zone, and rehabilitate the drainage system on Route 20 in Colusa County. (MND) (PPNO 2951) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 04-Ala-680, PM R10.6/R21.9; 04-CC-680, PM R0.0/1.1. Interstate 680 Express Lanes from State Route 84 to Alcosta Boulevard Project. Construct High Occupancy Vehicle/express lanes on I-680 in Alameda and Contra Costa Counties. (MND) (EA 0Q300) (Local Funds)
  • 05-SB-01, PM 50.3/50.6 05-SLO-01, PM 0.0/0.3. Santa Maria River Bridge Replacement. Replace the Santa Maria River Bridge on Route 1 at the border of San Luis Obispo County and Santa  Barbara County. (MND) (PNNO 2650) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 08-Riv-79, PM 5.4/11.4. SR-79 Construct Shoulders and Rumble Strips Project. Construct eight-foot paved shoulders, install rumble strips, and widen Temecula Creek Bridge on Route 79 in Riverside County. (MND) (PPNO 3006G) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 08-SBd-10, PM 36.4/R39.2 08-Riv-10, PM R0.0/R0.2.  I-10 Eastbound Truck Climbing Lane Improvement Project. Extend the eastbound truck climbing lane on I-10 from its current terminus, at the eastbound off-ramp to the Live Oak interchange, to eastbound of the County Line Road off-ramp, at the San Bernardino County and Riverside County line. (MND) (PPNO 3009Q) (STIP)
    (Related Item under Ref. 2.5c.(2))
  • ° 08-SBd-40, PM R100.0/R125.0.  Interstate 40 Median Regrade Project. Regrade median cross slopes on I-40 in San Bernardino County. (MND) (PPNO 3002W) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 09-Iny-395, PM 117.3/117.9. Meadow Farms ADA Project. Improve existing facilities to current Americans with Disabilities Act standards on US 395 in Inyo County. (ND) (PPNO 2641) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 10-Sta-108, PM 28.5/33.4 10-Sta-120, PM 12.22 10-Tuo-108, PM R0.97-53.03 10-Tuo-120, PM 6.01-11.29 10-Tuo-49, PM 17.6. Metal Beam Guardrail Upgrades. Upgrade metal beam guardrails along Route 108 and Route 120 in Stanislaus County and Route 108, Route 120, and Route 49 within Tuolumne County. (MND) (PPNO 3234) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 10-Sta-5, PM 15.8/15.9. Interstate 5/Sperry Road Interchange Project. Construct improvements to the I-5 / Sperry Road interchange in Stanislaus County. (MND) (EA 0G420) (Local Funds)

♠ (Jan) (2) Approval of Project for Future Consideration of Funding: 03-Yub-70, PM 14.8/15.7. SR 70 Binney Junction Roadway Rehabilitation and Complete Streets Project. Replace underpasses and add lanes on Route 70 in Yuba County.  (FEIR) (PPNO 9820) (SHOPP)  ❧ Deferred to a future meeting
(Related Item under Ref. 2.5b.(2))  (See (Mar) (5) below)

♠ (Mar) (1) Approval of Projects for Future Consideration of Funding: ❧ Approved
(“°” indicates projects below the level of interest for the pages on this site)

  • ° 01-Men-1, PM 65.13/65.49. Cleone Shoulder Widening Project. Widen shoulders and improve drainage features on Route 1 in Mendocino County. (MND) (PPNO 4656) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 03-Sac-51, PM 2.0/3.5. American River Bridge Deck Replacement. Remove and replace the existing concrete deck, girder post-tensioning systems, and make other improvements to rehabilitate the American River Bridge along Route 51 in Sacramento County. (MND) (PPNO 6402) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 05-SCr-9, PM 8.5/25.5 05-SM-9, PM 23.99. Upper Drainages Erosion Control Improvements. Upgrade drainage systems along Route 9 in Santa Cruz and San Mateo Counties. (MND) (PPNO 2627) (SHOPP)
  • 05-SB-154, PM R2.6. Alamo Pintado Creek Pedestrian Bridge Project. Remove the pedestrian bridge over Alamo Pintado Creek on Route 154 in Santa Barbara County. (MND) (PPNO 2391) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 05-SCr-9, PM 13.6/15.5. San Lorenzo River Bridge and Kings Creek Bridge Replacement Project. Replace two bridges on Route 9 in Santa Cruz County. (MND) (PPNO 2655) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 06-Ker-178, PM 12.60/55.40. Kern Canyon Culvert Rehabilitation. Rehabilitate drainage on Route 178 in Kern County. Two culverts and one overside drain will be built, 355 roadside signs will be replaced, and various Transportation Systems will be installed at 11 locations. (ND) (PPNO 6925) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 06-Fre-198, PM 0.51/19.5. Fresno 198 Culvert Rehabilitation. Rehabilitate culverts on Route 198 in Fresno County. “The existing culverts are either undersized or so damaged that they will require cleaning, repair, or replacement. Specific culverts have become so clogged with material that they allow very little water to pass through.” (MND) (PPNO 6921) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 06-Ker-119, PM 28.2/31.3. Pumpkin Center 3R Rehabilitation. Resurface, restore, and rehabilitate the roadway on Route 119 in Kern County. (MND) (PPNO 6805) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 06-Ker-184, PM 0.8/8.6. Weedpatch Highway Rehabilitation. Rehabilitate the roadway by providing 8-foot-wide shoulders and other improvements on Route 184 in Kern County.  (ND) (PPNO 6803) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 07-Ven-118, PM 11.97/13.40. State Route-118 Slope Restoration Project. Restore damaged slopes on Route 118 in Ventura County. “…permanently restore and repair the damage caused by past storms along both directions of Route 118 from Sand Canyon Road to 0.2 mile east of Balcom Canyon Road in Ventura County” (MND) (PPNO 5705) (SHOPP)
  • ° 08-SBd-40, PM R25.0/R50.0. Median Regrading on I-40 from Post Mile R25 to Post Mile R50 Project. Regrade median on I-40 in San Bernardino County.  (MND) (PPNO 3007X) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • 08-SBd-40, PM R100.8/R101.8. Interstate 40 Bridge Scour Mitigation. Replace Halfway Hills Wash Bridges on I-40 in San Bernardino County. (MND) (PPNO 3008K) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 10-Mpa-140, PM 25.3-51.8. Mariposa State Route 140 Pavement Preservation. Rehabilitate  Route 140 in Mariposa County. (ND) (PPNO 3167) (SHOPP)
    (Related Item under Ref. 2.5b.(2))
  • ° 10-Cal-26, PM 21.4/38.31. State Route 26 Slope Stabilization. Stabilize deteriorating slopes and improve drainage systems on both sides of State Route 26 in Calaveras County.  (MND) (PPNO 3132) (SHOPP)
    (Related Item under Ref. 2.5b.(2))

♠ (Mar) (5) Approval of Project for Future Consideration of Funding: 03-Yub-70, PM 14.8/15.7.  SR 70 Binney Junction Roadway Rehabilitation and Complete Streets Project. Replace underpasses and add lanes on Route 70 in Yuba County. (FEIR) (PPNO 9820) (SHOPP) ❧ Approved
(Related Item under Ref. 2.5b.(2d))

♠ (Mar) (6) Approval of Project for Future Consideration of Funding: 08-Riv-60, PM 20.0/22.0. State Route 60 / World Logistics Center Parkway Interchange Project. Reconstruct and improve the Route 60/World Logistics Center Parkway interchange in Riverside County. (FEIR) (EA 0M590) (Local Funds) ❧ Approved

♠ (Mar) (7) Approval of Project for Future Consideration of Funding: 05-SB-101, PM R36.0/R37.0. Refugio Road Undercrossing Bridges Replacement Project. Replace the Refugio Road Bridges on US 101 in Santa Barbara County. (FEIR) (PPNO 2448) (SHOPP) ❧ Approved

♠ (May) (1) Approval of Projects for Future Consideration of Funding: ❧ Minutes with vote results not available
(“°” indicates projects below the level of interest for the pages on this site)

  • ° 06-Fre-5, PM R37.20/48.80. Panoche Capital Preventative Maintenance. Rehabilitate pavement on I-5 in Fresno County. (MND) (PPNO 6970) (SHOPP)
    (Related item under Ref. 2.5b.(2))
  • 08-Riv-74, PM 2.9/3.2, 53.3/53.5. SR-74 Bridge Replacement Project. Replace Morrill Canyon Bridge and Strawberry Creek Bridge on Route 74 in Riverside County. (MND) (PPNO 3005Q) (SHOPP)
    (Related item under Ref. 2.5b.(2))
  • 10-SJ-580, PM 12.6/14.3. Interchange Improvements at I-580 at International Parkway/Patterson Pass Road. Improve the I-580 interchange at International Parkway/Patterson Pass Road in San Joaquin County. (MND) (PPNO 3416) (STIP)

2.3a. Route Adoptions

There were no items of interest for this agenda item in the reviewed minutes.

2.3b. New Public Road Connection

There were no items of interest for this agenda item in the reviewed minutes.

2.3c. Relinquishments

♠ (Jan) One Relinquishment Resolution: ❧ Approved

  1. 06-Kin-198-PM 16.91. Right of way along Route 198 on 12th Avenue and Union Pacific Railroad Crossing, in the city of Hanford.

♠ (Mar) Two Relinquishment Resolutions ❧ Approved

  1. 06-Fre-168-PM R8.9 Right of way along Route 168 on Temperance Avenue, in the city of Clovis.
  2. 10-SJ-4-PM R15.1/R15.2. Right of way along Route 4 on Del Norte Street and West Hazelton Avenue, in the county of San Joaquin.

♠ (May) One Relinquishment Resolution:  ❧ Minutes with vote results not available

  1. 04-CC-4-PM 27.3. Right of way along State Route 4 on G Street, in the city of Antioch.

2.3d. Vacations

♠ (Jan) One Vacation Resolution: 11-SD-5-PM 15.4. Right of way along I-5 on Russ Boulevard, in the city of San Diego. ❧ Approved

2.5a Minor Projects

♠ (Jan) Request of $4,349,000 for three District Minor projects. ❧ Approved

Of these, the following were of interest for the highway pages:

  • #1 $1,306,000 Los Angeles 07-LA-1 R48.7/R50.6. On Pacific Coast Highway Route 1, at Malibu Seafood Restaurant north of Pureco Canyon and south of Corral Canyon. Outcome/Output: Install pedestrian crossing with a flashing Pedestrian Hybrid Beacon system, striping, signs, and pavement markings. EA 4V010 ProjID 0718000265. (This is a substitute project for EA 07-4V190.)

♠ (May) Request of $2,568,000 for two District Minor projects. Resolution FP-20-68 ❧ Minutes with vote results not available

Of these, the following were of interest for the highway pages:

  • #2. $1,250,000 Shasta 02-Sha-5 11.5/12.8. I-5 In Shasta County, in and near Redding from 0.6 mile north of Smith Road Overcrossing to 0.1 mile south of Loma Vista Drive. Outcome/Output: Extend auxiliary lane. EA 2H800 ProjID 0217000010. (Financial Contribution Only (FCO) to the city of Redding.) (This is a substitute project for EA 02-0J380.)

2.5b. Financial Allocations for SHOPP Projects / Federal Discretionary Grant Funds

♠  (Jan) (1) Request of $145,494,000 for 14 SHOPP projects. Resolution FP-20-43
(Related Item under Ref. 2.1a.(1)) ❧ Approved

Of these, the following were of interest for the highway pages:

  • #2. $7,286,000. Siskiyou 02-Sis-3 38.0/38.6. PPNO 02-3546 ProjID 0214000013 EA 4G440. Route 3 Near Fort Jones, from 0.3 mile south to 0.3 mile north of West Moffett Creek Road at Moffett Creek Bridge No. 02-0042.   Outcome/Output: Replace deteriorating bridge with a single span concrete box girder bridge, upgrade bridge rails and provide standard width lanes and shoulders, and upgrade guardrail and end treatments. The allocation is divided into Con Eng $1,540,000; Const $6,990,000.  The difference from what was allocated appears to be due to savings in earlier phases. (Future consideration of funding approved under Resolution E-19-81; October 2019)
  • #6. $39,824,000. Sonoma 04-Son-1 15.1/15.7. PPNO 04-0748E ProjID 0400000129 EA 0A020. Route 1 Near Carmet, from 0.1 mile to 0.7 mile north of Calle Del Sol.   Outcome/Output: Realign roadway near Gleason Beach by moving the roadway inland which has been eroding due to sea level rise.  The project scope also includes widening to provide 8-foot shoulders, constructing a bridge over Scotty Creek floodplain, and constructing three access roads to provide connectivity to local community. Allocation division: CON ENG $3,400,000; CONST $35,824,000. (Future consideration of funding approved under Resolution E-16-77; October 2016.) (Concurrent amendment under SHOPP Amendment 20H-005; January 2021.)
  • #11. $30,717,000. Mariposa 10-Mpa-140 42.0/42.7. PPNO 10-0280B ProjID 1020000099 EA 0P923. Route 140 Near El Portal and Yosemite National Park, 0.5 miles west of South Fork Merced River.  Early Work Package No. 1 for Ferguson Slide Construction Manager/General Contractor (CMGC) parent project EA 0P921. Outcome/Output: Early work package to remove rock talus from slide location. Allocation division: CON ENG $8,000,000; CONST $27,000,000. (Future consideration of funding approved under Resolution E-14-20; May 2014.)

♠  (Jan) (2) Request of $85,249,000 for 78 SHOPP preconstruction project phases for environmental, design and R/W support. ❧ Approved as revised
(Related Items under Ref. 2.1a.(1), 2.2c.(1) and 2.2c.(2)) ((2a) Support Allocations for non-SB1 SHOPP Projects; (2b) Support Allocations for SHOPP SB 1 Projects of Primary Asset Classes)

Of these, the following were of interest for the highway pages:

  • (2a) #1. $3,187,000 (PA&ED) for 01-Hum-36 3.9/6.0. PPNO 01-2525 ProjID 0119000119 EA 0J890. Route 36 Near Carlotta, from west of Fisher Road to west of Wilder Road. Widen shoulders, extend westbound passing lane, construct soft median and rumblestrips, replace bridge, construct soldier pile wall and upgrade guardrail. Prog Year 23-24. (Concurrent Amendment under SHOPP Amendment 20H-005; January 2021.)
  • (2a) #3. $1,329,000 (PS&E); $105,000 (R/W Sup, $90,000 Programmed) 01-Hum-101 88.3/88.6. PPNO 01-2424; ProjID 0115000043; EA 0E890.US 101 In Arcata, from north of Route 299/Route 101 Connector to 0.2 mile south of Giuntoli Lane Overcrossing. Construct auxiliary lane to improve merging movements. Construct auxiliary lane to improve merging movements (Concurrent consideration of funding under Resolution E-21-02; January 2021.) (Twenty month time extension for PS&E approved under Waiver 19-29; June 2019.)  Prog Year 21-22.
  • (2a) #10. $1,160,000 (PA&ED). 03-Sut-99 T35.8/36.4. PPNO 03-8385; ProjID 0320000040; EA 0J910. Route 99 Near Live Oak, from 0.2 mile south of Encinal Road/Live Oak Boulevard to 0.1 mile north of  Kent Avenue; also from 0.1 mile south to 0.1 mile north of Eager Road (PM R33.8/R34.0). Eliminate direct access to Route 99 from Encinal Road/Live Oak Boulevard and improve the intersection of Live Oak Boulevard and Eager Road to enhance access to Route 99 at the Eager Road interchange. (Concurrent Amendment under SHOPP Amendment 20H-005; January 2021.)  Prog Year 23-24.
  • (2a) #20. $1,200,000 (PA&ED). 06-Ker-43 15.6/16.0. PPNO 06-7044; ProjID 0620000038; EA 1A470. Route 43 In Shafter, at the intersection with Santa Fe Way and Los Angeles Street. Construct roundabout. (Concurrent Amendment under SHOPP Amendment 20H-005; January 2021.)  Prog Year 23-24.
  • (2a) #26. $5,405,000 (PS&E; $4,700,000 Programmed); $863,000 (R/W Sup; $751,000 Programmed). 08-Riv-79 5.4/11.4. PPNO 08-3006G; ProjID 0816000049; EA 1G670. Route 79 Near Temecula, from 3.1 miles north of Route 371 to 1.1 miles south of Pauba Road. Construct shoulders and rumble strip. (Concurrent consideration of funding under Resolution E-21-06; January 2021.)  Prog Year 22-23.
  • (2a) #34. $1,010,000 (PA&ED). 10-Mer-152 R10.1/13.848. PPNO 10-3505; ProjID 1020000085; EA 1L630. Route 152 Near Los Banos, from 0.8 mile west Basalt Road to Route 5. Construct median barrier. (Concurrent Amendment under SHOPP Amendment 20H-005; January 2021.)  Prog Year 23-24.
  • (2a) #35. $847,000 (PA&ED). 10-SJ-4 20.5/20.9. PPNO 10-3492; ProjID 1020000103; EA 1L280. Route 4 Near Stockton, from east of Del Rey Court to east of South Walker Lane. Widen highway and construct a channelized left-turn lane. (Concurrent Amendment under SHOPP Amendment 20H-005; January 2021.) Prog Year 23-24.
  • (2b) #1. $1,600,000 (PS&E); $120,000 (R/W Sup). 03-Nev-80 13.0/15.5. PPNO 03-4294; ProjID 0316000064; EA 1H180. I-80 In Truckee, from west of Donner Pass Road Overcrossing to Bridge Street Undercrossing (PM 13.04/15.5). Rehabilitate roadway, construct auxiliary lane, upgrade Transportation Management System (TMS) elements, rehabilitate drainage systems, and upgrade facilities to Americans with Disabilities Act (ADA) standards. Prog Year 22-23.
  • (2b) #7. $3,718,000 (PS&E; $3,517,000 programmed); $455,000 (R/W Sup). 05-SLO-1 0.0/0.3. PPNO 05-2650; ProjID 0516000074; EA 1H440. Route 1 Near Guadalupe, at the Santa Maria River Bridge No. 49-0042; also in Santa Barbara County (PM 50.3/50.6). The bridge is scour critical and needs to be replaced. The existing bridge will be used for traffic handling during construction and then demolished. The highway will need to be realigned as a result of the new bridge location. The new bridge will provide standard lane and shoulder widths and include a protected walkway.  (Concurrent consideration of funding under Resolution E-21-06; January 2021.)  Prog Year 22-23.

♠  (Mar) (2a, 2b) Request of $99,689,000 for 60 $86,341,000 for 57 SHOPP preconstruction project phases for environmental, design and R/W support. ❧ Approved as revised
(Related Items under Ref. 2.1a.(1) and 2.2c.(1))  ((2a) Support Allocations for non-SB1 SHOPP Projects; (2b) Support Allocations for SHOPP SB 1 Projects of Primary Asset Classes)

Of these, the following were of interest for the highway pages:

  • (2a) #1. $1,777,000 (PA&ED). 01-Hum-101 125.2/125.6. PPNO 01-2536; ProjID 0120000035; EA 0K150. US 101 Near Orick, from 0.9 mile south to 0.5 mile south of South Prairie Creek Park Undercrossing. Improve curves and roadway cross slope, widen shoulders, and improve drainage. (Concurrent Amendment under SHOPP Amendment 20H-006; March 2021.)  Prog Year 23-24.
  • (2a) #2. $2,171,000 (PA&ED). 01-Hum-299 R8.0/R8.8. PPNO 01-2535; ProjID 0120000032; EA 0J801. Route 299 Near Blue Lake, from 0.9 mile east to 1.7 miles  east of Blue Lake Boulevard. Restore storm damaged roadway by relocating on a new alignment and construct retaining wall. (Long Lead Project)  (Concurrent Amendment under SHOPP Amendment 20H-006; March 2021.)  Prog Year 24-25.
  • (2a) #4. $682,000 (PA&ED). 01-Men-101 30.8/R33.8. PPNO 01-4751; ProjID 0120000062; EA 0K310. US 101 Near Ukiah, from Route 20 to 0.1 mile south of Uva Drive/North State Street. Construct median barrier. (Concurrent Amendment under SHOPP Amendment 20H-006; March 2021.)  Prog. year 22-23.
  • (2a) #6. $350,000 (PS&E); $100,000 (R/W Sup). 03-Nev-80 13.1/16.5. PPNO 03-4318; ProjID 0321000035; EA 1H181. I-80 In Truckee, from west of Donner Park Overcrossing to Route 80/Route 89/Route 267 Separation (PM 13.05/16.5). Construct auxiliary lanes and an acceleration lane. Prog. year 20-21.
  • (2a) #7. $800,000 (PS&E, $667,000 programmed); $42,000 (R/W Sup). 04-Ala-13 6.7/7.2. PPNO 04-1490P; ProjID 0415000356; EA 4J490. Route 13 In Oakland, from 0.2 mile north of Lincoln Avenue to 0.2 mile south of Park Boulevard.  Install outer separation barrier and construct rumble strips. Prog. year 20-21.
  • (2a) #19. $1,090,000 (PA&ED). 10-Mer-140 43.5/43.9. PPNO 10-3506; ProjID 1020000188; EA 1M170. Route 140 Near Planada, from west of Plainsburg Road to Sutter Street. Intersection improvements. (Concurrent Amendment under SHOPP Amendment 20H-006; March 2021.) Prog. year 23-24.
  • (2b) #1. $1,528,000 (PS&E, $1,295,000 programmed); $149,000 (R/W Sup, $127,000 programmed). 01-Men-162 8.2. PPNO 01-4692; ProjID 0117000223; EA 0A131. Route 162 Near Longvale, from 8.2 miles to 8.3 miles east of Route 101 at Eel River Bridge No. 10-0236. Bridge seismic retrofit. (Future consideration of funding approved under Resolution E-21-01; January 2021.)  Prog. year 21-22.
  • (2b) #2. $12,000,000 (PS&E); $600,000 (R/W Sup). 03-Sac-51 2.0/3.5. PPNO 03-6402; ProjID 0312000054; EA 3F070. Route 51 (Business Route 80) In the city of Sacramento, from north of B Street Underpass to north of Exposition Boulevard Overcrossing, at the American River Bridge No. 24-0003 and Cal Expo Undercrossing No. 24-0133.  Widen and replace bridge deck.  This is a Construction Manager/General Contractor (CMGC) project. (Concurrent consideration of funding under Resolution E-21-19; March 2021.)  (Concurrent Amendment under SHOPP Amendment 20H-006; March 2021.)  (As part of this allocation request, the Department is requesting to extend the completion of the R/W Sup phase an additional 36 months beyond the 72 month deadline.) (Eleven month time extension for PS&E and R/W Sup approved under Waiver 20-31; June 2020.) Prog. year 23-24.
  • (2b) #5. $6,630,000 (PS&E); $320,000 (R/W Sup). 05-SB-101 R36.0/R37.0. PPNO 05-2448; ProjID 0513000018; EA 1C950. US 101 Near Goleta, from 0.6 mile south and 0.4 mile north of Refugio Road Undercrossing No. 51-0215L/R and Canada del Refugio No. 51-0030S. Replace two bridges and upgrade bridge railing on one bridge. (Concurrent consideration of funding under Resolution E-21-37; March 2021.)  Prog. year 22-23.
  • (2b) #6. $2,130,000 (PS&E; $2,050,000 programmed). 05-SB-154 R2.6. PPNO 05-2391; ProjID 0512000139; EA 1C410. Route 154 Near Los Olivos, at Alamo Pintado Pedestrian Bridge No. 51-0076Y.  Replace bridge. (Concurrent consideration of funding under Resolution E-21-21; March 2021.) (Nine month time extension for PS&E approved under Waiver 20-31; June 2020.) Prog. year 21-22.
  • (2b) #7. $2,884,000 (PS&E); $600,000 (R/W Sup; $888,000 programmed). 05-SCr-9 13.6/15.5. PPNO 05-2655; ProjID 0516000078; EA 1H470. Route 9 Near Boulder Creek, at San Lorenzo River Bridge No. 36-0052 (PM 13.61) and Kings Creek Bridge No. 36-0054 (PM 15.49).  Replace bridges to maintain standards of safety and reliability. (Concurrent consideration of funding under Resolution E-21-22; March 2021.)  (Nine month time extension for PS&E and R/W Sup approved under Waiver 20-31; June 2020.)  Prog year 21-22.
  • (2b) #13. $2,188,000 (PS&E, $1,903,000 programmed); $56,000 (R/W Sup, $55,000 programmed). 08-SBd-40 101.3. PPNO 08-3008K; ProjID 0816000079; EA 1G830. I-40 Near Needles, at the Halfway Hills Wash Bridge No. 54-0799L/R.  Replace bridges, replace and expand Rock Slope Protection (RSP) limits. (Concurrent consideration of funding under Resolution E-21-29; March 2021.) Prog. year 21-22.

♠  (Mar) (2c) SHOPP Amendment: Request to rescind $6,715,000 for the design and R/W support phases for the Roadway Rehabilitation SHOPP project on Route 70 in Yuba County. (PPNO 9820/EA 0H160) (Related Item under Ref. 2.5b.(2d)) ❧ Approved

♠  (Mar) (2d) Request of $6,715,000 for the 2020 SHOPP preconstruction project phases for design and R/W support for the Route 70 Roadway Rehabilitation project in Yuba County. (PPNO 9820/EA 0H160): ❧ Approved
(Related Items under Ref. 2.2c.(5) and 2.5b.(2c))

  • #1. $3,940,000 (PS&E, $3,500,000 programmed); $2,775,000 (R/W Sup, $2,500,000 programmed). 03-Yub-70 14.8/15.7. PPNO 03-9820; ProjID 0315000082; EA 0H160. Route 70 In and near Marysville, from south of 14th Street to north of Cemetery Road. Roadway rehabilitation and operational improvements including turn pockets and auxiliary lanes. (Concurrent consideration of funding under Resolution E-21-35; March 2021.)  (Concurrent Amendment under SHOPP Amendment 20H-006; March 2021.)  (As part of this allocation request, the Department is requesting to extend the completion of the PS&E phase an additional 7 months beyond the 36 month deadline.) (As part of this allocation request, the Department is requesting to extend the completion of the R/W Sup phase an additional 36 months beyond the 72 month deadline.)  (Nineteen month time extension for PS&E and R/W Sup approved under Waiver 19-29; June 2019.)  Prog year 23-24.

♠  (May) (1) Request of $199,307,000 $196,619,000 for 22 21 SHOPP projects. Resolution FP-20-69. ❧ Minutes with vote results not available
(Related item under Ref. 2.1a.(1))

Of these, the following were of interest for the highway pages:

  • #8. $7,633,000. 05-Mon-156 R1.4/R2.0. PPNO 05-0900A; ProjID 0513000028; EA 0A090. Route 156 Near Castroville, from Route 183 to Castroville Boulevard at Bridge No 44-0033L.  Outcome/Output: Upgrade bridge railing and widen bridge. Programmed allocation: $1,800,000 (Con Eng); $6,600,000 (Const). Difference is due to preliminary engineering savings (budgeted⇢expended): PA&ED $70,000⇢$4,146; PS&E $2,880,000⇢$2,515,150; R/W Sup $198,000⇢$136,446.
  • #10. $2,300,000. 05-SCr-17 9.1/9.9. PPNO 05-2593; ProjID 0514000131; EA 1G260. Route 17 Near Scotts Valley, from 0.4 mile south of Laurel Road to 0.5 mile north of Laurel Road. Outcome/Output: Construct wildlife Undercrossing.  Local contributions to fund construction capital. Programmed allocation: $2,000,000 (Con Eng). Difference is due to preliminary engineering savings (budgeted⇢expended): PA&ED $738,000⇢$731,234; PS&E $2,238,000⇢$2,156,736; R/W Sup $226,000⇢$51,381. (Additional Contribution: $7,000,000 CONST from Santa Cruz County Regional Transportation Commission (SCCRTC).)

♠  (May) (2) Request of $56,818,000 for 38 2020 SHOPP preconstruction project phases for environmental, design and R/W support. ❧ Minutes with vote results not available
(Related items under Ref. 2.1a.(1) and 2.2c.(1)) ((2a) Support Allocations for non-SB1 SHOPP Projects; (2b) Support Allocations for SHOPP SB 1 Projects of Primary Asset Classes)

Of these, the following were of interest for the highway pages:

  • (2a) #1. $2,839,000 (PS&E); $198,000 (R/W Supp).  01-Hum-299 30.7/33.4. PPNO 01-2522; ProjID 0119000025; EA 0J410. Route 299 Near Willow Creek, from 0.1 mile east of Cedar Creek Road to 0.2 mile east of East Fork Willow Creek Bridge. Widen shoulders and improve curves at three locations. Prog year 21-22.
  • (2a) #2. $1,719,000 (PA&ED). 01-Men-101 41.2/R42.8. PPNO 01-4752; ProjID 0120000081; EA 0K410. US 101 Near Willits, from north of Black Bart Road to north of Waterplant/Grider Road. Construct concrete median barrier and retaining wall, upgrade guardrail, and make intersection improvements. (Concurrent Amendment under SHOPP Amendment 20H-007; May 2021.)  Prog. year 23-24.
  • (2a) #3. $4,200,000 (PS&E); $400,000 (R/W Sup). 03-But-70 46.0/47.0. PPNO 03-2293; ProjID 0318000012; EA 3H540. Route 70 Near Paradise, from 0.8 mile west to 0.2 mile east of Shady Rest Area. Restore and repair damaged roadway by raising the existing vertical alignment by approximately five feet and protecting the embankment against future flooding with Rock Slope Protection (RSP) or a retaining structure. (Future consideration of funding approved under Resolution E-21-03; January 2021.)  (Eleven month time extension for PS&E and R/W Sup approved under Waiver 20-31; June 2020.) Prog. year 20-21.
  • (2a) #12. $894,000 (PA&ED). 10-Mer-99 0.4/R12.7. PPNO 10-3510; ProjID 1020000183; EA 1L310. Route 99 In and near the city of Merced, from north of the Madera County line to south of East Childs Avenue. Construct median barrier. (Concurrent Amendment under SHOPP Amendment 20H-007; May 2021.)  Prog. year 23-24.
  • (2a) #13. $12,800,000 (PA&ED). 12-Ora-5 R29.1/44.382. PPNO 12-2833C; ProjID 1218000006; EA 0Q950 . I-5 In and near the cities of Tustin, Orange, Santa Ana, Anaheim, Fullerton, and Buena Park, from Red Hill Avenue to the Los Angeles County line. Address High Occupancy Vehicle (HOV) lane degradation. (Additional $2,200,000 from Interregional Improvement Program (IIP) contribution). (Long Lead Project) (Concurrent Amendment under SHOPP Amendment 20H-007; May 2021.)  Prog year 27-28.
  • (2b) #6. $2,000,000 (PS&E; $10,000,000 programmed); $90,000 (R/W Sup). 08-Riv-10 R60.7/R74.3. PPNO 08-3008A; ProjID 0816000086; EA 1C081. I-10 In and near Coachella, from 0.3 mile east of Coachella Canal to 0.2 mile east of Hazy Gulch Bridge. Cold plane pavement and overlay with Portland Cement Concrete (PCC). Construct eastbound truck climbing lane. A one lane temporary detour will be constructed in the median for traffic handling. (Future consideration of funding approved under Resolution E-20-121; December 2020.)  Prog year 21-22.
  • (2b) #7. $1,490,000 (PS&E; $1,295,000 programmed); $173,000 (R/W Sup; $150,000 programmed). 08-Riv-74 2.9/3.2, 53.4/54.7. PPNO 08-3005Q; ProjID 0816000001; EA 1G470. Route 74 Near Lake Elsinore, at Morrill Canyon Bridge No. 56-0169; also near Hemet, at Strawberry Creek Bridge No. 56-0180 (PM 53.4/54.7). Replace structures/upgrade rails. (Concurrent consideration of funding under Resolution E-21-39; May 2021.) Prog. year 21-22.

2.5c Financial Allocations for STIP Projects

♠ (Jan) (2) Request of $2,890,000 for the locally administered STIP I-10 Eastbound Truck Climbing Lane project, on the State Highway System, in San Bernardino County. (PPNO 3009Q)
(Related Item under Ref. 2.2c.(1)) ❧ Approved

♠ (Jan) (4) Request of $10,000,000 for the State-Administered STIP I-5 North Coast Corridor HOV Extension – Phase 1 – Carlsbad HOV Package 1 project, on the State Highway System, in San Diego County, programmed FY 22-23. (PPNO 0615G)  ❧ Approved

♠ (May) (1) Request of $58,721,000 for the State administered STIP Eureka/Arcata US 101 Corridor improvement project, on the State Highway System, in Humboldt County. (PPNO 0072)  ❧ Minutes with vote results not available

♠ (May) (5) Request of $92,966,000 for the State administered STIP Olancha and Cartago Expressway project on US 395, in Inyo County, on the State Highway System, programmed in FY 2021-22. (PPNO 0170) Resolution FP-20-77 ❧ Minutes with vote results not available

2.5d Allocations for Projects with Costs that Exceed 20 Percent of the Programmed Amount

There were no items of interest for this agenda item in the reviewed minutes.

2.5e Supplemental Fund Allocations

♠ (Jan) (1) Request for an additional $1,726,000 (83.2 percent increase) in Pre-Construction Support, Project Approval and Environmental Document (PA&ED) phase, for the SHOPP Bridge Preservation, Bridge Rehabilitation project on Route 128 in Napa County. (EA 4J830/PPNO 1451C)  ❧ Approved as revised

♠ (Jan) (2) Request for an additional $1,071,000 (37.8 percent increase) in Pre-Construction Support, PA&ED phase, for the SHOPP Roadway Preservation project on Route 110 in Los Angeles County. (EA 33150/PPNO 5083)  ❧ Approved as revised 

♠ (Jan) (3) Request for an additional $400,000 (22.2 percent increase) in Pre-Construction Support, Plans, Specifications and Estimates (PS&E) phase, for the SHOPP Major Damage, Permanent Restoration project on Route 1 in Sonoma County.  (EA 0A020/PPNO 0748E)   ❧ Approved as revised 

♠ (Jan) (6) Request for (No increase) in Construction Capital and an additional $1,500,000 (32.1 percent increase) in Construction Support for the SHOPP Bridge Preservation project on State Route 128 in Napa County. (EA-4G840/PPNO 0830B) ❧ Approved as revised

♠ (Mar) (15) Request for an additional $1,500,000 (4.1 percent increase) in Construction Capital, and no increase in Construction Support cost (0 percent increase), for the SHOPP Pavement Rehabilitation project on Route 99 in Sacramento County, to add auxiliary lanes to the project via a change order. (EA 0H480/PPNO 6924)  ❧ Withdrawn prior to meeting

♠ (May) (4) Request for an additional $4,900,000 (30.5 percent increase) in Pre-Construction Right of Way capital, for the SHOPP Roadway Safety Improvement project on Route 70 in Yuba County. (EA 4F380, PPNO 9819)  ❧ Minutes with vote results not available

2.5f Financial Allocations for SHOPP

♠ (Jan) Informational Reports on Allocations Under Delegated Authority:  ❧ Information Only

  • Emergency G-11 Allocations (2.5f.(1)): $53,876,000 for 13 projects.
  • SHOPP Safety Sub-Allocations (2.5f.(3)):$21,923,000 for four projects.
  • Minor G-05-16 Allocations (2.5f.(4)): $2,799,000 for three projects.

Of these, the following were of interest for the highway pages:

  • (1) #1. $19,300,000. 01-DN-101 15.1/15.5. PPNO 01-1128; ProjID 0118000074; EA 0H690. US 101 Near Klamath, from Wilson Creek Road to 1.7 miles north of Rudisill Road.  Due to continuous slope movement and increased landslides within the limits of Last Chance Grade slide complex, this project will repair four damaged retaining walls, construct one new retaining wall, install removable barrier rail, replace a failed culvert, and construct mechanically stabilized fill.  Supplemental: After the necessary studies and design analysis were completed, it has been identified that multiple changes in scope are necessary due to increased settlement, erosion, and slide movement.  This supplemental is necessary to move the roadway to a new alignment, construct an additional 600-ft retaining wall, replace two existing retaining walls, and place a multi-location video monitoring system. Allocation: $3,000,000 (Con Eng); $16,300,000 (Const).
  • (3) #1. $15,196,000. 04-Nap-121 0.5/1.0. PPNO 04-0775G ProjID 0412000310 EA 4G210. Route 121 Near Napa, at Huichica Creek Bridge No. 21-0001 (PM 0.75).   Outcome/Output: Improve safety by widening roadway at Huichica Creek by replacing the existing triple metal culverts with a free span bridge, improve fish passage, and restore creek banks.  This project will provide continuity to the widening constructed under safety project EA 44420, and will reduce the number and severity of collisions. CON ENG $3,000,000; CONST $12,247,000.

♠ (Mar) Informational Reports on Allocations Under Delegated Authority ❧ Information Only

  • Emergency G-11 Allocations (2.5f.(1)):  $75,628,000 for 16 projects.
  • SHOPP Safety Sub-Allocations (2.5f.(3)): $6,620,000 for three projects.
  • Minor G-05-16 Allocations (2.5f.(4)): $6,340,000 for seven projects.

Of these, the following were of interest for the highway pages:

  • (1) #15. $7,500,000. 11-Imp-111 45.2. PPNO 11-1368 ProjID 1119000057 EA 43066. Route 111 Near Calipatria, south of Gillespie Road.  A known mud pot in existence since 1953 has moved sporadically over decades; however, recent seismic activity has accelerated the movement and the natural geologic phenomenon is now within one hundred feet of the roadway.  The mudpot was previously traveling in a southwest direction but has recently changed course towards the northwest and towards the north end of the recently constructed detour connection with Route 111.  This supplemental is necessary to extend the north end detour further north to prevent closing this route caused by the altered direction of the mudpot. CON ENG $0; CONST $7,500,000.
  • (3) #1. $3,366,000. 01-Lak-175 0.2/0.4. PPNO 01-3118 ProjID 0117000226 EA 0H460. Route 175 Near Hopland, from 0.2 mile east to 0.4 mile east of Mendocino County line.   Outcome/Output: Improve safety by realigning curves and and widening shoulders. This project will reduce the number and severity of collisions. CON ENG $975,000; CONST $2,750,000.

♠ (May) Informational Reports on Allocations Under Delegated Authority ❧ Information Only

  • Emergency G-11 Allocations (2.5f.(1)):  $91,025,000 for 23 projects.
  • SHOPP Safety Sub-Allocations (2.5f.(3)): $13,228,000 for four projects.
  • Minor G-05-16 Allocations (2.5f.(4)):  $17,239,000 for 17 projects.

Of these, the following were of interest for the highway pages:

  • (1) #1. $17,000,000. 01-DN-101 12.0/16.5. PPNO 01-1145; ProjID 0121000044; EA 0L040. US 101 Near Crescent City, at Last Chance Grade, from 0.5 mile south to 4.0 miles north of Wilson Creek Road.  On February 13, 2021, a large cold storm front impacted Del Norte County which resulted in heavy rainfall and activated a large landslide complex and closed Route 101 in both directions due to extremely hazardous conditions and slide material blocking the roadway.  These storms brought high surf and caused damage to the embankment at PM 12.2 and PM 12.5.  This project will stabilize slope, install rock fall barrier and erosion control, repair or replace guardrail, drainage systems, signs, and pavement, and remove hazard trees. CON ENG $3,000,000 CONST $14,000,000.
  • (1) #16. $13,200,000+$400,000. 05-Mon-1 29.6/36.8. PPNO 05-3041; ProjID 0521000015; EA 1N410. Route 1 Near Big Sur, from 1.5 miles north of Big Creek Bridge to 0.6 mile north of Julia Via Bridge; also from 0.9 mile to 0.5 mile south of Big Creek Bridge (PM 27.2/27.6).  Heavy rainfall on January 27th and 28th caused large debris flows and a major washout at Rat Creek. The larger than normal debris flow is due to the Dolan Fire that burned over 128,000 acres in August 2020.  The high intensity storms  combined with fire damage debris lead to a blocked existing sixty-six inch drainage pipe that conveyed the flow under the embankment.  Runoff began to pond behind the roadway embankment until it overtopped the highway.  Resulting drainage water overtopping eroded the fill on the downstream side, and eventually eroded across both lanes.  This project will clear mud and debris, clear culvert inlets in the area, and place an enhanced embankment solution and pavement to restore the eroded roadway. R/W SUP $400,000; CON ENG $2,000,000; CONST $11,200,000.

2.5g Prop 1B Project Allocations

There were no items of interest for this agenda item in the reviewed minutes.

2.5s Senate Bill 1 Programs Project Allocations Local Partnership Program (LPP) Allocations

♠ (May) (2) Request of $25,000,000 for the locally-administered LPP-Competitive US 101/De La Cruz Boulevard/Trimble Road Interchange Improvements project, on the State Highway System, in Santa Clara County. (PPNO 0462J) (Related item under Ref. 4.12) ❧ Minutes with vote results not available

♠ (May) (5) Request of $18,000,000 for the locally-administered TCEP Interstate 680/Route 4 Interchange Improvements – Phases 1, 2A project, on the State Highway System, in Contra Costa County. (PPNO 0298F)  ❧ Minutes with vote results not available

♠ (May) (8) Request of $67,520,000 for the State Administered Multi-Funded South Coast U.S. 101 HOV-Padaro (Segment 4B). A project, on the State Highway System, in Santa Barbara County.
(PPNO 7101D) (Related items under Ref. 2.1s.(1) and 2.5d.(1)) ❧ Minutes with vote results not available

2.5t Traffic Congestion Relief Program (TCRP) Allocations

There were no items of interest for this agenda item in the reviewed minutes.

2.6g Transit and Intercity Rail Capital Program (TIRCP) Allocations

There were no items of interest for this agenda item in the reviewed minutes.

4. TCIF and Aeronautic Program Updates / Policy Matters

♠ (Jan) 4.7 US 101 Liberty Canyon Wildlife Crossing Update ❧ Information Only

♠ (Jan) 4.19 Update on the Route 140 Ferguson Slide Construction Manager/General Contractor SHOPP projects: Ferguson Slide Permanent Restoration (Mariposa County). ❧ Information Only

♠  (Mar) 4.25 2018 Local Partnership Competitive Program Amendment: Request to deprogram $700,000 from the Capital SouthEast Connector Expressway Project– Segment B2 (discussed with Route 148) due to cost savings and program $700,000 to Segment A2 to increase project scope.  Revise Segment A2 project description to include increased scope. ❧ Approved

Other Matters/Public Comment

There were no items of interest for this agenda item in the reviewed minutes.

 

FREQUENTLY USED TERMS IN CTC MINUTES: California Transportation Commission (Commission or CTC), California Department of Transportation (Department or Caltrans), Regional Improvement Program (RIP), Interregional Improvement Program (IIP), State Transportation Improvement Program (STIP), State Highway Operation and Protection Program (SHOPP), Traffic Congestion Relief Program (TCRP), Public Transportation Account (PTA), Clean Air and Transportation Improvement Act of 1990 (Proposition 116), High Speed Passenger Train Bond Program (Proposition 1A), Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006 (Proposition 1B), Corridor Mobility Improvement Account (CMIA), State Route 99 Bond Program (RTE or SR 99), Local Bridge Seismic Retrofit Account (LBSRA), Trade Corridors Improvement Fund (TCIF), Highway-Railroad Crossing Safety Account (HRCSA), State-Local Partnership Program (SLPP), Traffic Light Synchronization Program (TLSP), Letter of No Prejudice (LONP), Environmental Phase (PA&ED), Design Phase (PS&E), Right of Way (R/W), Fiscal Year (FY), Active Transportation Program (ATP), Intercity Rail (ICR), California Aid to Airports Program (CAAP), Acquisition & Development (A&D), Transit and Inter-City Rail Capital Program (TIRCP), Transportation Facilities Account (TFA), Trade Corridor Enhancement Program (TCEP), Local Partnership Program (LPP), Local Streets and Roads Program (LSRP), Solutions for Congested Corridors Program (SCCP).