🚘 Changes to the California Highways website: July – Sept 2026

Another quarterly cycle of updates to the website is complete. Here’s the changelog. Bottom Line: In addition to all the changes from headlines and various posts and emails, significant changes include: the addition of a load of new maps, including survey maps for Placer County; a link to a post with the history of Camp Hess Kramer; the passage of a lot of bills and resolutions at the end of the legislative cycle for the year; and loads of interesting actions from the CTC if you dig and read through them.

This update covers July, August, and September 2026. Before we dive into the updates to the California Highways site, an update on the California Highways: Route by Route podcast. As always, you can keep up with the show at the podcast’s forever home at https://www.caroutebyroute.org , the show’s page on Spotify for Podcasters, or you can subscribe through your favorite podcaster or via the RSS feeds (CARxR, Spotify for Podcasters). The following episodes have been posted since the last update on June 27, 2026:

  • July | CA RxR 4.13: Route 14: The Antelope Valley Freeway. Episode 4.13 continues our exploration of Route 14, picking up from the end of the first segment at I-5, and continuing to the junction with US 395 near Inyokern. As usual, along the way, we explore the history of the route, the conversion to freeway, major projects on the route, and naming along the route. This includes a detailed exploration of the start of the route in the Newhall Pass and Solemint area. It also includes an exploration of the “Aerospace Highway” name, and all the firsts that occurred at Edwards AFB and the test center next to the highway. Ep. 4.13 marks the end of the main episodes of Season 4, although we do have a couple of bonus episodes planned for the season break to tide you over. The first bonus episode, 4.14, covers New Idria Road and Hites Cove Road, which are mining roads in San Benito and Mariposa counties. (Spotify for Creators)
  • July | CA RxR 4.14: Bonus: New Idria Road and Hites Cove Road. Episode 4.14 is the first of two bonus episodes. It tells the story of the corridors of New Idria Road and Hites Cove Road. Both of these historic highway corridors lead to mining in Central California. This episode is based off blogs released on Gribblenation during October 2025 and May 2026. New Idria Road is an approximately 21.5-mile rural highway located in the Diablo Range of San Benito County. It branches off of Panoche Road, and winds its way south-ish through the Diablo range to the ghost mining town of Idria, continuing as Clear Creek Road. Hites Cove Road is an approximately seven-mile rural highway corridor located in the Sierra Nevada range of Mariposa County, south of Route 140, and west of El Portal. Hites Cove, and its successor forest and OHV trail roads, leads to the ghost town of Hites Cove on the south fork of the Merced River. Two interesting stories about two interesting ghost towns. Next up: Our second bonus episode to close out Season 4: A roundtable discussion with Adam Prince and Doug Kerr as we celebrate the 25th anniversary of the start of Gribblenation. (Spotify for Creators)
  • August | CA RxR 4.15: Bonus: 25 Years of Gribblenation. Episode 4.15 is the second of two bonus episodes. The year 2026 marks 25 years since Adam Prince, Doug Kerr, and Brian LeBlanc started the website. This episode features a discussion with Daniel, Tom (a Gribblenation contributor), Adam, and Doug about the past, present, and future of Gribblenation. Learn the story of how the site came to be, how the name was chosen, the hiccups along the way, and where the site is today. More importantly, learn the philosophy behind Gribblenation: To not only tell the facts and the history of the roads, but to tell the stories behind the roads. Next update: Coming sometime in late September 2026 will be Season 5 of the podcast, starting with the story of Route 15 and I-15 between San Diego and Temecula. (Spotify for Creators)
  • September | CA RxR 5.01: I-15 (Part 1): South of Temecula. Welcome to Season 5. We start the season with three episodes covering Route 15. The first (this episode), covers LRN 15, Sign Route 15, and today’s Route 15 between San Diego and Temecula. LRN 15 ran from what is now Route 1 near Fort Bragg to what is today’s I-80 near Emigrant Gap; it is today’s Route 20. Sign Route 15 is what became Route 7 and later I-710, and is today’s Long Beach Freeway. We have some interesting exploration of the ends of Sign Route 15 in Pasadena and Long Beach. We then turn to the main focus of the episode: Route 15, which runs from San Diego to the Nevada border, and has a complicated history. So complicated, in fact, that this episode focuses only on the portion between San Diego and Temecula, exploring both former Route 103 and US 395, as well as the transition from US 395 to today’s I-15 routing. Episode 5.02 will cover Temecula to Devore, and explore the history of I-15, I-15E, I-215, Route 71, US 91, US 395, and Route 194. Lastly, Episode 5.03 will cover Devore to Nevada, including I-15, US 395, US 66, US 91, and US 466 (with a bit of Route 195 and US 95 thrown in). (Spotify for Creators)

Turning to the updates to the California Highways pages: Updates were made to the following highways, based on my reading of the (virtual) papers and my research for the fifth season of the podcast in July, August, and September 2026 (which are posted to the roadgeeking category at the “Observations Along The Road” and to the California Highways Facebook group) as well as any backed up email changes. I also reviewed the the AAroads forum (Ꜳ). This resulted in changes on the following routes, with credit as indicated [my research(ℱ), contributions of information or leads (via direct mail or ꜲRoads) from Fred Akbar (FredAkbar)(2), Concrete Bob(3), Nathan Edgars (NE2)(4), Tom Fearer(5), Andy Field (andy3175)(6), Gonelookin(7),Adrian Ople(8), Mike Palmer(9), Plutonic Panda(10), Jim Rogers(11), Howard Schroeter(12), Tom Slater(13)]: Route 1(ℱ), Route 4(ℱ), I-5(ℱ), I-8(ℱ), Route 9(ℱ), I-10(ℱ,4,12), Route 12(ℱ,5), Route 14(ℱ), I-15(ℱ,6), Route 17(ℱ), Route 24(ℱ), Route 25(ℱ,5), Sign Route 26(ℱ), Route 26(ℱ), Route 29(ℱ), Route 34(ℱ), Route 36(11), Route 37(ℱ), Route 39(ℱ), Route 41(ℱ), Route 47(10), Route 49(ℱ), US 50(ℱ,9), Route 57(ℱ), Route 58(2,6,5), Route 64(ℱ), Former US 66(ℱ), Route 71(ℱ), Route 74(ℱ,6,10), Route 77(ℱ), I-80(ℱ), Route 84(ℱ), Route 85(ℱ), Route 86(ℱ), Route 88(5,7), Route 91(ℱ,6), Route 92(ℱ), Route 93(ℱ), Route 99(ℱ), US 101(ℱ,5), I-105(ℱ), Route 107(ℱ), Route 118(ℱ), Route 120(ℱ), Route 121(ℱ), Route 123(ℱ), Route 125(ℱ), Route 133(ℱ), Route 138(ℱ), Route 142(ℱ), Route 145(ℱ), Route 163(ℱ), Route 169(5), LRN 176(ℱ), Route 178(5), Route 180(5), Route 187(ℱ), I-215(4,12), Route 217(ℱ), Route 227(ℱ), Route 246(ℱ), Route 260(ℱ), Route 271(5), Route 299(ℱ), US 395(ℱ,5), I-405(ℱ), I-580(ℱ), I-605(ℱ), I-680(ℱ), I-710(9), I-880(ℱ), County Sign Route 66(ℱ), County Sign Route S26(8), County Sign Route S27(8), County Sign Route S28(8), County Sign Route S30(8), County Sign Route S32(8), De Anza Trail(9). Updated all the business route links, based on a post on AARoads. Added a link to the DeLeuw, Carther, & Company report, “Report on a Plan for Trafficways and Modifications to Railroad Operations and Facilities, Sacramento Metropolitan Area, Volume 1” to the Sacramento History Page(3).
(Source: private email through 10/1/2026, Highway headline posts through and including the September 2026 Headline post, AARoads through 10/1/2026)

Continued work on Season 5 of the Route by Route podcast. Research for and preparation of the episodes posted or written during this period resulted in changes and updates to the following routes: I-15, Route 16, Route 17, Route 18, Route 19, Route 30, Route 38, US 66, Route 71, Route 79, Sign Route 83, Route 85, US 91, US 95, Route 103, Route 130, Route 163, Route 164, Route 195, Route 206, I-210, Route 214, I-215, Route 238, Route 259, Route 262, I-280, Route 371, US 395, I-580, I-680, LRN 15, LRN 16, LRN 17, LRN 18, LRN 31, LRN 40, LRN 43, LRN 50, LRN 77, LRN 78, LRN 115, LRN 167, LRN 175, LRN 178, LRN 190, LRN 191, LRN 192, LRN 194, LRN 275, LRN 277, History of California Interstates.

Added some more GIS resources to the maps page. As a reminder: The California Highways Maps Page is often your best starting point for map-based research into California Highways. If readers are aware of any additional map-based resources I should add to that page, please let me know.

Updated Chargeable and Non-Chargeable Interstates and the Introduction to Interstate Highway Types pages to discuss the current funding formulas, and to clarify that the chargeable/non-chargeable distinction is more historic and less applicable today. Hat tip to Rothman on AARoads in this discussion for making me aware of the need to do another update pass on those pages.

Reviewed the online agenda of the California Coastal Commission for the July through September meetings. The following items were of interest:

  • September (Weds): Agenda Item 12.a. September 2026 Progress Report on the Caltrans Eureka-Arcata Hwy 101 Corridor Sea Level Rise Adaptation Plan. Informational update on Caltrans District 1’s progress on preparing a comprehensive adaptation plan for protecting, relocating, or otherwise adapting the Eureka-Arcata US 101 Corridor improvements authorized under CDP № 1-18-1078 to address anticipated sea level rise related flooding hazards.

Note that I also reviewed the CCC archives for information related to Camp Hess Kramer in Malibu. This was combined with other research, and led to a blog entry: “A Pre-History of Camp Hess Kramer“. This blog explores the history of camp property prior to the acquisition of the land by Wilshire Blvd Temple, including the history of Rindge Family ownership. I’m still looking for more information, particularly related to the history of the Yerba Buena School, the construction of Yerba Buena Road, and the construction of Decker Canyon Road (Route 23). The blog post also includes information on the future of Camp Hess Kramer and its sister camp, Gindling Hilltop Camp, as well as some records research. The post is also linked on the page for Route 1.

Reviewed the Pending Legislation page, based on the California Legislature site, for bills through 2026-10-01. As usual, I recommend to every Californian that they visit the legislative website regularly and see what their legis-critters are doing. As many people are unfamiliar with how the legislature operates (and why there are so many “non-substantive changes” and “gut and amend” bills), I’ve added the legislative calendar (updated for 2026) to the end of the Pending Legislation page. This is early in the even-numbered year session, so there’s a lot of introduction of placeholder bills, and a lot of amending of those placeholder bills (and bills that remained active from the previous year). Noted the passage of the following bills / resolutions (I also identified a number of errors in bills and resolutions, and submitted comments as indicated):

  • AB 686 (Berman) Elections: deceptive audio or visual media.
    Existing law, until January 1, 2027, prohibits a person, committee, or other entity, within 60 days of an election at which a candidate for elective office will appear on the ballot, from distributing with actual malice materially deceptive audio or visual media of the candidate with the intent to injure the candidate’s reputation or to deceive a voter into voting for or against the candidate, unless the media includes a disclosure stating that the media has been manipulated, subject to specified exemptions.

    Existing law, until January 1, 2027, authorizes a candidate for elective office whose voice or likeness appears in audio or visual media distributed in violation of this section to seek injunctive or other equitable relief prohibiting the distribution of the deceptive audio or visual media; authorizes a candidate whose voice or likeness appears in the deceptive audio or visual media to bring an action for general or special damages against the person, committee, or other entity that distributed the media; and authorizes the court to award a prevailing party reasonable attorney’s fees and costs. A court is required to place such proceedings on the calendar in the order of their date of filing and give them precedence.

    This bill would extend the repeal date of these provisions to January 1, 2031.

    09/19/26 Chaptered by Secretary of State – Chapter 334, Statutes of 2026.

  • AB 1145 (Jeff Gonzalez) Vehicles: local regulation: Department of Transportation.
    Existing law authorizes local authorities, for those highways under their jurisdiction, to adopt rules and regulations by ordinance or resolution, on various matters, including regulating traffic by means of specified official traffic control devices and prohibiting the use of particular highways by certain vehicles. Existing law authorizes specified proposed ordinances or resolutions to be effective as to any state highway or part thereof if the proposed ordinance or resolution is submitted to the Department of Transportation for approval prior to the enactment, as specified.

    This bill would require the Department of Transportation, when reviewing and approving or rejecting an ordinance or resolution that has been submitted to the department for approval by a local authority, to consider the costs of the proposed ordinance or resolution compared to any possible alternative solution to the issue that the proposed ordinance or resolution is addressing and to provide written reasons and justifications for a rejection.

    09/27/26 Chaptered by Secretary of State – Chapter 511, Statutes of 2026.

  • AB 1267 (Pellerin) Marriage: prohibition on minors.
    Existing law authorizes an unmarried person who is under 18 years of age to marry upon obtaining a court order granting permission and the written consent of at least one of the parents or the guardian of each underage party to the marriage, as specified. Existing law requires the court, if it considers it necessary, as part of the court order granting permission to marry, to require the parties to the prospective marriage of a minor to participate in premarital counseling, as specified.

    Existing law provides that 2 unmarried, unrelated adults who have chosen to share one another’s lives in an intimate and committed relationship of mutual caring may establish a domestic partnership by filing a declaration with the Secretary of State, if certain requirements are met. Existing law provides that a person under 18 years of age who, together with the person with whom the person proposes to establish a domestic partnership, meets the requirements for a domestic partnership other than the requirement of being at least 18 years of age, is capable of consenting to and establishing a domestic partnership upon obtaining a court order granting permission to the underage person or persons to establish a domestic partnership. Under existing law, registered domestic partners have the same rights, protections, and benefits as spouses.

    This bill would repeal the authorization for a person under 18 years of age to be issued a marriage license or to establish a domestic partnership, thereby prohibiting a person under 18 years of age from being issued a marriage license or from establishing a domestic partnership. The bill would make conforming changes.

    Existing law requires the State Registrar to create a document, no later than March 1, 2020, concerning marriage certificates in which one or both of the parties were minors at the time of solemnization of the marriage. Existing law requires the State Registrar to update that document annually, as specified. Existing law requires the local registrar to submit specified information for the purposes of that report.

    This bill would repeal those provisions.

    09/30/26 Chaptered by Secretary of State – Res. Chapter TBD, Statutes of 2026. (Conf by BBC)

  • AB 1338 (Solache) Department of Transportation: transferred property: City of Lynwood.
    Existing law vests the Department of Transportation with full possession and control of all state highways and all property and rights on property acquired for state highway purposes. Various provisions of existing law specifically provide for the acquisition, transfer, and use of property owned by the department.

    This bill would, with respect to a parcel that the department transferred to the City of Lynwood, require the department, upon request from the city, to develop and enter into an agreement with the city to release and remove a deed restriction imposed on that parcel if the city agrees to transfer the deed restriction to another specified parcel and other certain other requirements are met. If the city and department enter into this agreement, the bill would require the city to submit reports to the Legislature, and specified committees of the Legislature, at prescribed intervals on the use of this authority to develop those parcels.

    This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Lynwood.

    09/27/26 Chaptered by Secretary of State – Chapter 516, Statutes of 2026.

  • AB 1836 (Gabriel) California State Nonprofit Security Grant Program.
    Existing law establishes the California State Nonprofit Security Grant Program under the administration of the Director of Emergency Services to improve the physical security of nonprofit organizations that are at high risk of violent attacks or hate crimes due to ideology, beliefs, or mission. Existing law authorizes applicants to use grant funds for prescribed security enhancements, including security training. Existing law makes the operation of the program contingent upon appropriation in the annual Budget Act.

    This bill would instead establish the California State Nonprofit Security Grant Program to improve the physical security of nonprofit organizations and events hosted by nonprofit organizations that are at a high risk of violent attacks or hate crimes, as described above. The bill would also authorize the grant money to be used by applicants for security enhancements for security for onsite or offsite events hosted by a nonprofit organization, as defined and specified. The bill would prohibit these provisions from limiting a nonprofit organization without a physical site from being eligible for funding for offsite events, as specified. The bill would limit security for offsite events to $25,000 of the grant funds awarded. The bill would prohibit the Office of Emergency Services from imposing monetary and percentile limits on any individual eligible security enhancement, except as specified.

    09/25/26 Chaptered by Secretary of State – Chapter 441, Statutes of 2026.

  • AB 1856 (Wicks) Age verification signals: software applications and online services.
    Existing law, the Digital Age Assurance Act (DAAA), beginning January 1, 2027, requires, among other things related to age verification with respect to software applications, an operating system provider, as defined, to provide an accessible interface at account setup that requires an account holder, as defined, to indicate the birth date, age, or both, of the user of that device for the purpose of providing a signal regarding the user’s age bracket to applications available in a covered application store. Existing law defines the term “user” for these purposes to mean a child that is the primary user of a device.

    This bill would, among other things, delete that definition of “user,” would specify that the requirement of an operating system provider to provide an accessible interface applies if an operating system operates on a device and has an account setup feature, and would require the signal to be provided to a covered application store or application developer, as prescribed. The bill would prohibit a person from requesting a signal with respect to a particular user from an operating system provider or a covered application store if not required to do so by the DAAA or any other applicable law.

    09/10/26 Chaptered by Secretary of State – Chapter 184, Statutes of 2026.

  • AB 2015 (Wicks) Department of Transportation: third-party navigation applications: study and report.
    Existing law establishes the Department of Transportation and vests it with full possession and control of the state highway system.

    This bill would require the department, in consultation with the Transportation Agency and relevant regional and local authorities, to conduct a pilot study in a region or area of the state, as determined by the department, on the impact of third-party navigation applications on the state highway system and local street and road networks. The bill would require the pilot study to analyze how third-party navigation applications affect congestion displacement, local infrastructure, safety metrics, and emergency response, as provided. The bill would require the department, on or before January 1, 2029, to submit the study, and a report of related policy recommendations for regulatory or legislative action to improve the alignment between third-party navigation applications and state and local traffic management goals, to the relevant fiscal and policy committees of the Legislature. The bill would repeal these provisions on January 1, 2033.

    09/15/26 Chaptered by Secretary of State – Chapter 207, Statutes of 2026.

  • AB 2059 (Wilson) California Environmental Quality Act: transportation impacts: vehicle miles traveled: mitigation.
    The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.

    CEQA requires the Office of Land Use and Climate Innovation to prepare, develop, and transmit to the Secretary of the Natural Resources Agency for certification and adoption proposed revisions to the CEQA implementation guidelines to establish criteria for determining the significance of transportation impacts of projects within transit priority areas, and requires the criteria to promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses. CEQA requires the office to recommend potential metrics, including, among other metrics, vehicle miles traveled, to measure these transportation impacts.

    This bill would require the Department of Transportation, in consultation with specified entities, to, on or before December 31, 2030, develop guidance on vehicle-miles-travel mitigation measures for transportation projects in nonmetropolitan counties, as provided. The bill would require the department to publish the guidance on its internet website and add the guidance as an addendum to the Transportation Analysis Framework and the Transportation Analysis under CEQA. The bill would specify that a transportation project for which the lead agency has issued a notice of preparation for the project’s environmental impact report on or before December 31, 2031 is presumed to have a less than significant transportation impact as determined by the vehicle-miles-traveled metric if at least 70% of the project lies within one or more nonmetropolitan counties. Because the bill would impose additional duties on a lead agency in its analysis of significant transportation impacts, this bill would impose a state-mandated local program.

    The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

    This bill would provide that no reimbursement is required by this act for a specified reason.

    09/27/26 Chaptered by Secretary of State – Chapter 576, Statutes of 2026.

  • AB 2541 (Mark González) Lowrider License Plate Program.
    Existing law establishes a specialized license plate program and requires the Department of Motor Vehicles to issue specialized license plates, also referred to as environmental license plates, on behalf of a sponsoring state agency if the agency receives 7,500 applications for that plate within a 12-month period, among other requirements. Existing law authorizes a person who is the registered owner or lessee of a vehicle to apply to the department for specialized license plates. Existing law imposes a fee, in addition to the regular registration fee, for the issuance, renewal, retention, transfer, and duplication of specialized license plates. Existing law requires that all revenue derived from these fees be deposited in the California Environmental License Plate Fund.

    This bill would require the Arts Council to apply to the department to sponsor “The Lowrider” specialized license plate program, as specified. The bill would require the design of the plate to reflect lowrider culture and heritage. The bill would require the council to consult with a nonprofit entity for plate design consultation, stakeholder engagement, publicity, and community outreach. The bill would authorize the council to accept and use donated or licensed artwork from a nonprofit entity for these purposes, and to use funds from nonprofit or private sources to augment implementation. The bill would require the department, after deducting its administrative costs, to deposit additional revenue derived from the issuance, renewal, transfer, and substitution of the plate into the Specialized License Plate Fund in the State Treasury. The bill would require the council to use those funds, upon appropriation by the Legislature, to fund projects that include, among others, supporting lowrider arts and cultural preservation efforts. The bill would authorize the council to use 4 to 6% of those funds to consult with or enter into an agreement with a nonprofit entity to support implementation of the program.

    09/16/26 Chaptered by Secretary of State – Chapter 243, Statutes of 2026.

  • AB 2576 (Harabedian) Transit-oriented development: exclusions: historic sites.
    Existing law provides that a housing development project shall be an allowed use as a transit-oriented housing development if specified conditions and requirements are met. Existing law provides that these provisions do not apply to a local agency until July 1, 2026, unless the local agency adopts an ordinance or local transit-oriented development alternative plan, as defined, deemed compliant by the Department of Housing and Community Development before July 1, 2026. Existing law specifies that, beginning on January 1, 2027, a local government that denies a housing development project meeting the requirements referenced above that is located in a high-resource area is presumed to be in violation of specified law and immediately liable for specified penalties. Existing law specifies exclusions from the provisions described above, including, among other sites prior to one year following the adoption of the 7th revision of the housing element, a site with a historic resource designated as of January 1, 2025, on a local register.

    This bill would also exclude from the provisions described above, a contributing site within a historic district included on the State Historic Resources Inventory designated before January 1, 2025, and a parcel individually listed as a historical resource included on the State Historic Resources Inventory designated before January 1, 2025.

    This bill would incorporate additional changes to Section 65912.161 of the Government Code proposed by AB 2415 to be operative only if this bill and AB 2415 are enacted and this bill is enacted last.
    [Note: As of 2026-10-01, AB 2415 had not yet progressed to the Enrollment stage.]

    09/15/26 Chaptered by Secretary of State – Chapter 214, Statutes of 2026.

  • AB 2788 (Committee on Transportation) Transportation: omnibus bill.
    (1) Existing law authorizes a city or county in which a planned transportation facility was to be located on State Highway Route 238 in the City of Hayward and the County of Alameda to develop and file with the California Transportation Commission a local alternative transportation improvement program that addresses transportation problems and opportunities in the county, and provides for the use of revenues from the sale of excess properties acquired for the planned state facility in order to fund the local alternative transportation improvement program. Existing law prohibits the commission from approving a local alternative transportation improvement program submitted under these provisions after July 1, 2010. Existing law requires revenues from excess property sales for State Highway Route 238 to be deposited into a separate account in the Special Deposit Fund, a continuously appropriated fund, to be available for expenditure by local agencies for projects designated in the local alternative transportation improvement program.

    This bill would authorize the Alameda County Transportation Commission to file an amendment to the local alternative transportation improvement program for approval by the commission, and would authorize that amendment to propose to revise the projects listed in the program. Before filing the proposed amendment with the commission, the bill would require the Alameda County Transportation Commission to obtain the approval of the amendment from the city councils of the Cities of Hayward and San Leandro and the board of supervisors of the County of Alameda. By authorizing the commission to approve a revised list of projects, the bill would expand the purposes for which continuously appropriated funds may be expended, thereby making an appropriation.

    (2) Existing law makes it a crime for a person to pilot a vessel through the Golden Gate and into or out of a harbor in the Bays of San Francisco, San Pablo, and Suisun, unless the person has a license as a pilot, as provided. Existing law defines “Bays of San Francisco, San Pablo, and Suisun” as all the waters of the Bay of San Francisco, Bay of San Pablo, and Bay of Suisun, and of the tributaries, ports, and harbors of those bays, including the water areas from the south end of San Francisco Bay and from the Ports of Sacramento and Stockton to the Golden Gate Bridge. Existing law requires a pilot that provides pilotage service in the Bays of San Francisco, San Pablo, and Suisun to be insured, as provided, and requires a vessel, owner, operator, or demise or bareboat charterer hiring the pilot to either defend, indemnify, and hold harmless the pilot or provide trip insurance, as provided.

    This bill would clarify that the Bays of San Francisco, San Pablo, and Suisun includes the Ports of Sacramento and Stockton. The bill would also clarify that those insurance provisions apply to any portion of a vessel transit that occurs within the waters of the Ports of Sacramento and Stockton. To the extent the bill would expand the definition of the Bays of San Francisco, San Pablo, and Suisun, it would increase the scope of a crime and impose a state-mandated local program.

    (3) Existing law specifies standards and requirements for the equipment of motor vehicles. Existing law generally requires motor carriers, drivers, and vehicles to comply with the Federal Motor Carrier Safety Regulations related to safety requirements for commercial motor vehicle operations, subject to department regulations. Under existing law, it is an infraction for a person to violate, or fail to comply with, a provision of the Vehicle Code, unless otherwise specified.

    This bill would additionally require motor carriers, drivers, vehicles, and shippers to comply with specified federal regulations related to the transportation of hazardous materials to the extent that they relate to transportation by highway unless the motor carrier, driver, vehicle, or shipper is an agency of the federal government. The bill would clarify that motor carriers, drivers, vehicles, and shippers not subject to the federal regulations described above are required to comply with those regulations unless specifically exempted from that compliance pursuant to department regulations. Because a violation of these provisions would be a crime, the bill would impose a state-mandated local program.

    (4) Existing law authorizes a city, county, or city and county to establish an automated traffic enforcement system program to use those systems to detect a violation of a traffic control signal, if the system meets specified requirements. Existing law makes photographic, video, and administrative records made by a system confidential and specifies that data about the number of violations issued is not an administrative record required to be disclosed. Existing law establishes an administrative hearing process for notices of violations issued under these provisions and authorizes a contestant to seek review of the final decision by filing an appeal to the small claims division of the superior court or the traffic division of the superior court, as specified. Existing law provides that the conduct of the hearing on appeal is a subordinate duty that may be performed by a commissioner or other subordinate judicial officer, as specified.

    This bill would instead specify that data about the number of violations issued is not an administrative record prohibited from disclosure and is subject to disclosure. The bill would delete references to the small claims division or traffic division of a superior court in the above-described provisions and instead authorize a contestant to file an appeal to the superior court. The bill would provide that the conduct of the hearing on appeal may be a subordinate duty. The bill would also make a conforming change.

    (5) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

    This bill would provide that no reimbursement is required by this act for a specified reason.

    09/15/26 Chaptered by Secretary of State – Chapter 223, Statutes of 2026.

  • ACR 126 (Tangipa) Captain Vidar Anderson Memorial Highway.
    Designates the portion of US 395, from Rock Creek Road (MNO R10.264) to the South Landing Overcrossing № 47-0048 (MNO R13.931), in the County of Mono as the “Captain Vidar Anderson Memorial Highway”.

    08/10/26 Chaptered by Secretary of State – Res. Chapter 156, Statutes of 2026.

  • ACR 137 (Ransom) San Joaquin County Deputy Sheriff Dighton Little Memorial Highway.
    Designates the portion of Route 99 from the East Hammer Lane overpass (SJ 22.922) to the Armstrong Road overpass (SJ 27.504), in the County of San Joaquin, as the “San Joaquin County Deputy Sheriff Dighton Little Memorial Highway”.

    06/26/26 Chaptered by Secretary of State – Res. Chapter 133, Statutes of 2026.

  • ACR 142 (Ransom) San Joaquin County Sheriff’s Deputies Floyd and Michael Coleman Memorial Highway.
    Designates the portion of Route 120 from N Ripon Road (SJ 9.82) to S Van Allen Road (SJ 13.83), in the County of San Joaquin as the “San Joaquin County Sheriff’s Deputies Floyd and Michael Coleman Memorial Highway”.

    06/26/26 Chaptered by Secretary of State – Res. Chapter 134, Statutes of 2026.

  • ACR 162 ( Hadwick) Congressman Doug LaMalfa Memorial Highway.
    Designates the portion of Route 99 from Cottonwood Creek BB № 12-0206 (BUT 15.374) [actually, Bridge № 12-0120 (BUT 15.41)] to Dry Creek Bridge № 12-0123 (BUT 20.598) [actually, Bridge № 12-0196 (BUT 20.60)], in the County of Butte as the “Congressman Doug LaMalfa Memorial Highway”.

    08/25/26 Chaptered by Secretary of State – Res. Chapter 208, Statutes of 2026.

  • ACR 169 (DeMaio) The United States Navy Sailor Noah Tobin Memorial Overcrossing.
    Designate the Deer Springs Road Overcrossing № 57-0891, at postmile R36.636 on Route 15 in the County of San Diego as “The United States Navy Sailor Noah Tobin Memorial Overcrossing”.

    06/30/26 Chaptered by Secretary of State – Res. Chapter 140, Statutes of 2026.

  • ACR 218 (Ramos) The Huuc Atam Highway.
    Designates the portion of Route 18 in the County of San Bernardino from the junction with Route 210, at postmile SBD T6.179, to the Old Waterman Canyon Road, at postmile SBD 9.150, as the “Huuc Atam Highway”.

    08/27/26 Chaptered by Secretary of State – Res. Chapter 213, Statutes of 2026.

  • SB 869 (Weber Pierson) Restaurant menus: added sugar warnings.
    Existing law, the California Retail Food Code, establishes uniform health and sanitation standards for, and provides for regulation by the State Department of Public Health of, retail food facilities, and requires local health agencies to enforce those provisions. Existing law makes a person who violates a provision of the code guilty of a misdemeanor. Existing law requires certain food facilities to provide written notification of the major food allergens that the food facility knows or reasonably should know are contained as an ingredient in each menu item, either directly on its menu or in a digital format, as specified.

    This bill, on or before January 1, 2029, would require a chain restaurant offering a standard menu beverage item with high added sugar content, as defined, to display on its menus an added sugar icon immediately adjacent to each standard menu beverage item with high added sugar content, as specified. The bill would require a chain restaurant to display a clear and conspicuous warning explaining the added sugar icon. The bill would require a chain restaurant to display the information directly on its drive-through menus and, additionally, either on its physical menus or in a digital format, as specified. By expanding the scope of an existing crime and by imposing new duties on local health officials, this bill would impose a state-mandated local program.

    The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

    This bill would provide that with regard to certain mandates no reimbursement is required by this act for a specified reason.

    With regard to any other mandates, this bill would provide that, if the Commission on State Mandates determines that the bill contains costs so mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.

    09/28/26 Chaptered by Secretary of State – Chapter 723, Statutes of 2026.

  • SB 884 (Umberg) Elections in 2026, 2027, and 2028.
    Existing law generally requires county elections officials to divide the county into precincts and designate a polling place for each precinct. As an alternative, a county elections official may conduct any election using vote centers instead of polling places. Existing law requires counties to provide ballot dropoff locations that are open beginning at least 28 days before the election. Under existing law, a vote by mail ballot is timely cast if it is postmarked on or before election day and received in the mail by the voter’s elections official no later than 7 days after election day. Existing law prohibits and makes it a misdemeanor to engage in specified electioneering activities within 100 feet of a polling place, elections official’s office, satellite location, or an outdoor site at which a voter may cast or drop off a ballot.

    This bill, for any regular or special election, beginning with the November 3, 2026, statewide general election, held in 2026 through 2029, inclusive, or proclaimed in 2029, would do the following: (1) require all ballot dropoff locations to be open beginning at least 30 days before the election; (2) prohibit law enforcement officers from making arrests within 200 feet of a polling place on election day, except for a crime related to disrupting the operation of the polling place or a crime against a person or property; (3) authorize a county board of supervisors to extend the prohibition on electioneering activities to up to 200 feet of the specified voting locations; (4) require law enforcement officers to notify the Secretary of State and Attorney General of a suspected, planned, or actual violation of the prohibitions on arrests or electioneering activities near polling places; (5) authorize the state and local governments to place reasonable restrictions on polling places located on their property; and (6) authorize a county elections official to extend the time for closing the polls at any polling place if the county elections official determines that voting at the polling place was disrupted as a result of a violation of the prohibitions on arrests or electioneering activities near polling places.

    By increasing the duties of county elections officials, and by expanding the scope of an existing crime, this bill would impose a state-mandated local program.

    The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

    This bill would provide that with regard to certain mandates no reimbursement is required by this act for a specified reason.

    With regard to any other mandates, this bill would provide that, if the Commission on State Mandates determines that the bill contains costs so mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.

    This bill would declare that it is to take effect immediately as an urgency statute.

    09/19/26 Chaptered by Secretary of State. Chapter 340, Statutes of 2026.

  • SB 922 (Laird) Vehicles: local agency charges: use of streets or highways.
    Existing law prohibits a local agency from imposing a tax, permit fee, or other charge for the privilege of using its streets or highways, other than a permit fee for an extralegal load unless the local agency had imposed the fee prior to June 1, 1989.

    This bill would explicitly state that a fee, charge, surcharge, or component thereof imposed upon the provider of, or ratepayer for, public services by or for a local agency to recover the cost of street maintenance and repair and other costs associated with the use of its streets, roads, or highways to provide those public services is not a tax, permit fee, or other charge that is prohibited by the provision described above. The bill would provide that nothing in the Vehicle Code prohibits a local agency from imposing or collecting this fee, charge, or surcharge. The bill would delete obsolete references and make other technical changes. The bill would make various findings and declarations.

    08/27/26 Chaptered by Secretary of State. Chapter 148, Statutes of 2026.

  • SB 990 (Grove) Highways: exit information.
    Existing law requires the Department of Transportation to adopt rules and regulations that allow the placement, near exits on freeways in rural areas, of information signs identifying specific roadside businesses. Existing law generally prohibits the placement of a sign within an urban area with a population of 5,000 or more, with certain exceptions.

    This bill, until January 1, 2037, would require the department to allow the placement of information signs along southbound State Route 395 just before the State Route 178 eastbound exit and along northbound State Route 395 just before the South China Lake Boulevard northbound exit, as provided.

    09/14/26 Chaptered by Secretary of State. Chapter 226, Statutes of 2026.

  • SB 1087 (Cabaldon) Transportation planning: sustainable communities strategies: Road Maintenance and Rehabilitation Program: local planning grants.
    (1) Existing law requires certain transportation planning agencies to prepare and adopt regional transportation plans directed at achieving a coordinated and balanced regional transportation system. Existing law requires a regional transportation plan to include a policy element, a sustainable communities strategy prepared by a metropolitan planning organization, an action element, and a financial element, as provided. Existing law requires those transportation planning agencies to adopt and submit every 4 years, except as provided, an updated regional transportation plan to the California Transportation Commission and the Department of Transportation.

    Existing law requires a sustainable communities strategy to achieve regional targets set by the State Air Resources Board for the reduction of greenhouse gas emissions from the automobile and light truck sector in the region for 2020 and 2035, respectively, and requires the state board to update those targets every 8 years, consistent with each metropolitan planning organization’s timeframe for updating its regional transportation plan, as specified. Existing law establishes certain procedural requirements for setting and updating those targets and authorizes the state board to revise the targets every 4 years based on changes in specified factors. Existing law, to the extent the sustainable communities strategy is unable to achieve the greenhouse gas emission reduction targets, requires a metropolitan planning organization to prepare an alternative planning strategy to the sustainable communities strategy showing how the targets would be achieved through alternative development patterns, infrastructure, or additional transportation measures or policies. Existing law requires the state board to review each metropolitan planning organization’s sustainable communities strategy and alternative planning strategy to determine whether the strategy, if implemented, would achieve the greenhouse gas emission reduction targets.

    This bill would revise and recast the requirements for a sustainable communities strategy, including, among other things, (A) requiring a sustainable communities strategy every 8 years with a progress report after 4 years instead of requiring a sustainable communities strategy every 4 years, (B) requiring the state board to provide each region with greenhouse gas emission reduction targets for 2035 and 2045, and (C) requiring the state board to hold technical workshops before providing those targets. The bill would also revise the state board’s process for reviewing sustainable communities strategies and alternative planning strategies, as specified.

    Because the bill would expand duties of local agencies, it would impose a state-mandated local program.

    (2) Existing law requires, commencing January 1, 2020, the San Diego Association of Governments to begin developing an implementation report that tracks the implementation of its most recently adopted sustainable communities strategy, as provided. Existing law requires the Sacramento Area Council of Governments to report on the regional implementation of its most recently adopted sustainable communities strategy, as provided.

    This bill would repeal those provisions.

    (3) Existing law requires the Department of Transportation to prepare the California Transportation Plan for submission to the Governor and the Legislature as a long-range planning document that incorporates various elements and is consistent with specified expressions of legislative intent. Existing law requires the plan to identify the statewide integrated multimodal transportation system needed to achieve statewide greenhouse gas emission reduction targets and to attain state and national air quality standards.

    This bill would also require the plan to, among other things, incorporate performance measures into planning that informs delivery of transportation capital projects to help achieve the goals of the plan. The bill would, commencing with the 3rd update to the plan, revise the information that the department is required to include in the plan to include, among others, relevant performance measures within each district of the department.

    (4) Existing law requires certain funds appropriated by the Legislature from the Public Transportation Account to be made available for specified purposes, including, among other purposes, for the department’s planning activities, mass transportation responsibilities, and assistance in regional transportation planning, as specified.

    This bill, for any activities within the region of a metropolitan planning organization, would require the department to limit funding to activities that are consistent with an applicable sustainable communities strategy or alternative planning strategy, as specified.

    (5) Existing law creates the Road Maintenance and Rehabilitation Program to address deferred maintenance on the state highway system and the local street and road system. Existing law provides for the deposit of various moneys for the program into the Road Maintenance and Rehabilitation Account. Existing law requires funds in the account to be allocated for various purposes, including, among others, $25,000,000, upon appropriation by the Legislature, for local planning grants to encourage local and regional planning that furthers state goals, as provided. Existing law requires the department to develop a grant guide for the allocation of these grants.

    This bill, for areas within a metropolitan planning organization, would require the grant guide to encourage planning that furthers the goals of a sustainable communities strategy or alternative planning strategy.

    (6) Existing law requires the commission, under a program commonly known as the Trade Corridor Enhancement Program, to allocate certain state and federal funds to infrastructure projects located on or along specified transportation corridors. Existing law establishes the Solutions for Congested Corridors Program and requires the commission to allocate state funds made available to the program to projects designed to achieve a balanced set of transportation, environmental, and community access improvements within highly congested travel corridors throughout the state. Under both programs, existing law requires projects within the boundaries of a metropolitan planning organization to be included in an adopted regional transportation plan that includes a sustainable communities strategy determined by the state board to achieve the region’s greenhouse gas emission reduction targets.

    For purposes of those programs, this bill would instead require, if the metropolitan planning organization has adopted an alternative planning strategy, the projects to meet prescribed requirements, including that the predominant purpose of the project is to implement a specific greenhouse gas emission reduction strategy or addresses an impediment to achieving an applicable greenhouse gas emission reduction target identified in the alternative planning strategy.

    (7) Existing law requires funding to be available under the Solutions for Congested Corridors Program for projects that make specific performance improvements and are part of a comprehensive corridor plan designed to reduce congestion in highly traveled corridors. Existing law authorizes the department and certain regional transportation planning agencies to nominate projects for funding through the program.

    This bill would require funding to be available under the program for projects that, among other things, make specific performance improvements and support the implementation of a regional transportation plan. The bill would revise the requirements applicable to a project nomination under the program. The bill would require the commission to allocate program funds to projects that, among other things, are included in an adopted regional transportation plan, as specified.

    (8) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

    This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.

    09/30/26    Approved by the Governor.

  • SB 1250 (Cortese) State highway system: wildlife connectivity.
    Existing law vests the Department of Transportation (Caltrans) with full possession and control of the state highway system and requires Caltrans to improve and maintain the state highways. Existing law requires Caltrans, in consultation with the California Transportation Commission, to prepare a robust asset management plan to guide selection of projects for the state highway operation and protection program (SHOPP).

    This bill would require the department, in connection with each revision of the asset management plan, to prepare and publish a supplemental list of wildlife connectivity improvements on the state highway system, as specified, and would require the department to submit the supplemental list to the commission for review and comments before the final list is published.

    Existing law declares the intent of the Legislature that Caltrans review the full extent of the state highway system, as currently maintained, in consultation with the Department of Fish and Wildlife and with opportunities for the public to provide data input for consideration, to develop a comprehensive approach to address wildlife connectivity needs throughout the state with the goal of implementing measures that protect, conserve, and improve the state’s unique wildlife, landscapes, and natural resources.

    This bill would explicitly require Caltrans to undertake this duty, in consultation with the Department of Fish and Wildlife and with opportunities for the public to provide data and input for consideration, as specified.

    Existing law requires Caltrans, in consultation with the Department of Fish and Wildlife and other appropriate agencies, to establish an inventory of connectivity needs on the state highway system where the implementation of wildlife passage features could reduce wildlife-vehicle collisions or enhance wildlife connectivity, and to update the inventory on a biennial basis, as specified.

    This bill would instead require Caltrans, in consultation with the Department of Fish and Wildlife and other appropriate agencies, to assess potential barriers to wildlife to establish an inventory of connectivity needs on the state highway system where the implementation of wildlife passage features could reduce wildlife-vehicle collisions or enhance wildlife connectivity. The bill would require the biennial update to the inventory to be based on an analysis of transportation assets within priority route segments identified by the Department of Fish and Wildlife. The bill would require Caltrans to consult with the Department of Fish and Wildlife on the development of each update to the inventory, as prescribed.

    Existing law requires Caltrans to prepare a State Highway System Management Plan (SHSMP), which includes a 10-year rehabilitation plan for the rehabilitation or reconstruction by the SHOPP of all state highways and bridges, and a 5-year maintenance plan that addresses the maintenance needs of the state highway system, as provided. Existing law requires the SHSMP to include specific quantifiable accomplishments, goals, objectives, costs, and performance measures consistent with the asset management plan described above. Existing law requires the SHSMP to be updated every 2 years.

    This bill would require Caltrans to include wildlife connectivity as an objective in the SHSMP.

    09/29/26 Chaptered by Secretary of State. Chapter 821, Statutes of 2026. (per Dave Cortese)

  • SB 1274 (Archuleta) Industrial cities.
    Existing law provides for the operation of various programs and services.

    This bill would define “industrial city” for purposes of state programs, policies, and funding formulas that expressly incorporate the definition.

    [According to the author as explanation: California is home to a small number of unique cities that have a higher daytime workforce population than nighttime residential population. In these cities, the number of jobs exceeds the number of residents, industrial land use often dominates the municipal footprint, and freight and commercial traffic often represent a significant share of roadway demand. This phenomenon typically occurs when a city is primarily zoned for industrial use and is experiencing large numbers of workers commuting to and from the city every day. One of the many unique challenges faced by industrial cities is the lack of financial resources for infrastructure maintenance and transportation. Because many transportation funding formulas rely heavily upon a city’s residential population, industrial cities in California are not receiving funding that reflects the reality of roadway wear, freight demand, and infrastructure usage in their jurisdictions.]

    09/14/26 Chaptered by Secretary of State. Chapter 231, Statutes of 2026.

  • SCR 108 (Archuleta) Deputy David Piquette Memorial Highway.Designates the portion of Route 91 from the junction with Route 90 at postmile R12.078 to west of Weir Canyon Road at postmile R14.108L, in the County of Orange, as the “Deputy David Piquette Memorial Highway”.

    08/18/26 Chaptered by Secretary of State. Res. Chapter 179, Statutes of 2026.

  • SCR 117 (Dahle) John Hughes Memorial Bridge.Designates the Butte City Bridge on Route 162 at the Sacramento River, Bridge № 11-0100 at GLE 76.660 [this is the new Butte City Bridge; the old bridge, which is is replacing, was № 11-0017, PM GLE 76.70], in the County of Glenn, as the “John Hughes Memorial Bridge”.

    07/16/26 Chaptered by Secretary of State. Res. Chapter 150, Statutes of 2026.

  • SCR 119 (Dahle) Gordon Lee Bordsen Memorial Highway.Designates the portion of Route 20 from Acacia Avenue (SUT 9.176) to Humphrey Road (SUT 10.672), in the County of Sutter, as the “Gordon Lee Bordsen Memorial Highway”.

    07/16/26 Chaptered by Secretary of State. Res. Chapter 151, Statutes of 2026.

  • SCR 129 (Cortese) Rusty Areias Highway.Designates the portion of Route 152 in the County of Santa Clara, from Cedar Creek Bridge № 37-0030R/L (SCL R28.163) to Sidehill Viaduct Bridge № 37-0398 (SCL 31.656) [Note: There is no Sidehill Viaduct Bridge № 37-0398, however, there is a PM at 04-SCL-152 31.656] as the “Rusty Areias Highway”.

    08/24/26 Chaptered by Secretary of State. Res. Chapter 196, Statutes of 2026.

  • SCR 155 (Jones) Officer Kirk Leland Johnson Memorial Interchange.Designates the interchange at Route 52 (11-SD-52 3.761) and I-805 (11-SD-805 23.57), in the County of San Diego, as the “Officer Kirk Leland Johnson Memorial Interchange”.

    07/16/26 Chaptered by Secretary of State. Res. Chapter 154, Statutes of 2026.

I checked California Transportation Commission page for the agenda and results of the August 2026 meetings of the California Transportation Commission. As always, note that I tend not to track items that do not impact these pages — i.e., pavement rehabilitation or replacement, landscaping, drainage, culverts, roadside facilities, charging stations, or other things that do not impact the routing or history, unless they are really significant. As such, the following items were of interest:

[ Note: ° indicates items that were below the level of detail for updating the specific route pages; ♠ is an indicator used to keep track of what has been added to the pages; ❧ indicates the results from the meeting, if the meeting minutes were available. ]

2.1a. STIP/SHOPP Program/Project Amendments

♠ (1) SHOPP Amendments for Approval: Request to:
(Related Items under Ref.: 2.5b.(1), 2.5b.(2), 2.5d.(4), and 2.5f.)

  • Add 21 new projects into the 2026 SHOPP. (2.1a.(1a))
  • Revise 13 projects currently programmed in the 2026 SHOPP. (2.1a.(1d) and 2.1a.(1f))

Of these, the following projects/allocation were at the level of interest for the highway pages (general, these are significant new structures or changes, as opposed to repair or rehabilitation in place; additions of bike paths, pedestrian, or complete street elements; or non-visible changes). “⊘” indicates phase not authorized.

  • (1a) #2. 02-Sha-44 R7.75/R8.25. PPNO 02-3976; ProjID 0226000029; EA 3K230. Route 44 Near Palo Cedro, at the intersection of Silver Bridge Road. Construct roundabout. Concurrent COS allocation under Resolution FP-26-09; August 2026. Allocation ($ × $1000): PA&ED $1,950; PS&E $1,670; R/W Sup $170; Con Sup $1,930; R/W Cap $92; Const Cap $9,620; TOTAL $15,432. BC: 1/2/2030.
  • (1a) #6. 11-Imp-86 62.38. PPNO 11-1627; ProjID 1125000091; EA 43272. Route 86 Near Salton City, at intersection with Black Diamond Road. Construct roundabout. Concurrent COS allocation under Resolution FP-26-09; August 2026. Allocation ($ × $1000): PA&ED $970; PS&E $1,420; R/W Sup $250; Con Sup $1,457; R/W Cap $460; Const Cap $7,965; TOTAL $12,522. BC: 9/30/2030.
  • (1a) #7. 01-Hum-101 79.5L/80.2. PPNO 01-3327; ProjID 0126000138; EA 0R250. US 101 In Eureka, at Eureka Slough Bridge № 04-0022L. Construct work trestle parallel to and west of the bridge to perform geotechnical investigations and to provide construction access for permanent solution. Note: On April 13, 2026, a routine underwater inspection of the Eureka Slough Bridges was performed, prompting a Record of Critical Finding (RCF) for the southbound bridge. The RCF documented that the southeast end of the pile cap under Column 3 of Bent 7 is undermined and there are six missing piles. The likely cause of missing piles is attack by marine borers. This bridge is a high volume and high speed utility. The traffic has been shifted away from the affected area to reduce the live load effects and tilt sensors have been installed. The bridge is under continuous monitoring with a potential of full closure if the movement exceeds tolerable thresholds. This project will construct a work trestle parallel to and west of the bridge to perform geotechnical investigations and to provide construction access for potential solutions. After the completion of further analysis, a supplemental will be submitted for project’s full scope and funding. Allocation ($ × $1000): PA&ED $0; PS&E $0; R/W Sup $100; Con Sup $3,500; R/W Cap $100; Const Cap $19,500; TOTAL $23,200.
  • (1a) #21. 07-LA-107 0.00/4.80. PPNO 07-6551; ProjID 0726000177; EA 1A620. Route 107 In Torrance, from Route 1 (Pacific Coast Highway) to Redondo Beach Boulevard. Financial Contribution Only (FCO) to City of Torrance to relinquish roadway. Concurrent CONST allocation under Resolution FP-26-08; August 2026. Allocation ($ × $1000): PA&ED $0; PS&E $0; R/W Sup $0; Con Sup $0; R/W Cap $0; Const Cap $11,550; TOTAL $11,550. BC: 8/24/2026.
  • (1d) #5. 02-Sha-273 5.2/14.5. PPNO 02-3930; ProjID 0224000158; EA 1K720. Route 273 In and near Anderson and Redding, from South Street to Buenaventura Boulevard. Construct concrete median barrier, drainage systems, widen shoulders, install luminaires, and shoulder rumble strips. Note: During project development, it was determined that the double arm lighting in the median could not be installed at some locations due to challenges with clear recovery zone. So single arm lighting in the shoulder is proposed for those locations. This requires extensive utility verification as well as coordination with railroad. This has resulted in increase in R/W capital and reduction in construction capital. Allocation Changes ($ × 1,000): PA&ED $2,460; PS&E $2,690; R/W Sup $390; Con Sup $4,100; R/W Cap $155 $655; Const Cap $66,600 $66,100; TOTAL $76,395 $76,395.
  • (1d) #7. 04-Mrn-37 R11.2 R11.4/13.8 13.5. PPNO 04-2925W; ProjID 0424000193; EA 4Q321. Route 37 In and near Novato, from 0.2 mile east of Route 101 to 0.2 mile west of Atherton Avenue. Replace Novato Creek Bridge № 27-0011L/R and construct drainage systems. (Additional contribution of $15,000,000 for PS&E from the General Fund provided by Assembly Bill 179 (AB 179); Additional contribution of $25,000,000 for Const Cap from Transportation Authority of Marin (TAM).) (G13 Contingency) Concurrent CONST and CON ENG allocation under Resolution FP-26-08; August 2026. Note: Remove G13 Contingency to fully fund construction phases. Update postmiles to reflect accurate project limits. Split off an environmental and stormwater mitigation child project EA 4Q323/PPNO 04-2933W from parent project EA 4Q321/PPNO 04-2925W for offsite environmental stormwater mitigation and to satisfy California Department of Fish and Wildlife funding assurance requirements for Incidental Take Permit, which mandates full mitigation for impacts on species listed under the CA Endangered Species Act. Allocation Changes ($ × 1,000): PA&ED $0; PS&E $0; R/W Sup $0; Con Sup $30,000; R/W Cap $4,200 $700; Const Cap $186,000 $165,500; TOTAL $220,200 $196,200.
  • (1d) #12. 11-SD-75 PM R20.1/R22.3 & 11-SD-5 PM R13.8/R14.3 PPNO 11-1352; ProjID 1119000044; EA 43063. Route 75 In the city of San Diego, on San Diego-Coronado Bay Bridge № 57-0857 and E75-N5 Connector Overcrossing № 57-0912G; also on Route 5 at S5-S75 Connector Overcrossing № 57-0939H (PM R13.8/R14.3). Install suicide deterrent fences along bridges. This is a Progressive Design-Build (PD-B) project. (PS&E, R/W Sup, R/W Cap Only) Concurrent Greater than 20 percent CONST and CON ENG allocation under Resolution FP-26-04; August 2026. Note: Fully program unfunded phases of this previous Future Need project. Allocation Changes ($ × 1,000): PA&ED $0; PS&E $14,000; R/W Sup $69; ⊘Con Sup $15,000; R/W Cap $331; ⊘Const Cap $94,800; TOTAL $124,200.

♠ (3) STIP Amendment for Approval: The California Department of Transportation (Department) proposes to amend the 2026 STIP to modify the scope of the STIP Fix 5 Cascade Gateway / I-5 Improvements Shasta project (PPNO 3597), in Shasta and Tehama Counties.
(Related Items under Ref.: 2.2c.(2), 2.5b.(1), and 2.5s.(9))

2.1b. STIP Program/Project Amendments/Approvals for Notice

♠ (2) STIP Amendment for Notice: The Department, Contra Costa Transportation Authority (CCTA), and the Metropolitan Transportation Commission (MTC) propose to amend the 2026 STIP to deprogram $7,500,000 in STIP (RIP) funds currently programmed to the PS&E phase of the Route 4 Operational Improvements – Phase 1 project (0299A) and program these funds to the Construction phase of the I-80/San Pablo Dam Interchange–Phase 2 project (PPNO 0242K) in Contra Costa County, in Fiscal Year 2028–29.

2.1s. Trade Corridor Enhancement Program Amendment (TCEP)

There were no items of interest for this agenda item in the reviewed minutes.

2.2a. Submittal of Notice of Preparation for Comments

There were no items of interest for this agenda item in the reviewed minutes.

2.2b. Submittal of Notice of Documents Available for Comment (DEIRs)

There were no items of interest for this agenda item in the reviewed minutes.

2.2c. Approval of Projects for New Public Road Connection / Future Consideration of Funding

♠ (1) Approval of 9 Projects for Future Consideration of Funding: (° indicates items that were below the level of detail for updating the specific route pages)

  1. °01-01-DN-101, PM 12.6/13.2. Wilson Creek Restoration and SPGA Wall Project. Restore the roadway to pre-storm conditions on US 101 in Del Norte County, from Post Miles 12.6 to 13.2. Specifically, stabilize the roadway with a modified alignment and construction of retaining walls, including a soldier pile ground anchor (SPGA) wall. (ND) (PPNO 1138) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))
  2. 02-03-Pla-267, PM 0.0/9.63. Placer 267 CAPM Project. Perform capital preventive maintenance (CAPM), including pavement and drainage rehabilitation and truck climbing lane extension on Route 267 in Placer County between Post Miles (PM) 0.0 and 9.63 south of Truckee. Specifically, the existing southbound truck climbing lane would be extended approximately 1,600 feet from 370 feet south of Martis Peak Road (PM 6.28) and end before Carnelian Bay Avenue (PM 6.59) and the shoulders adjacent to the truck climbing lane between PM 6.16 and PM 6.33 would be widened to 8 feet. (MND) (PPNO 5728) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))
  3. °03-04-Mrn-1, PM 37.2. Storm Damage Restoration Project. Restore the slope adjacent to the roadway and repair existing asphalt concrete pavement to prevent future slope failures on Route 1 at Post Mile 37.2 in Marin County. (MND) (PPNO 2913H) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))
  4. °04-04-Son-116, PM 7.74/25.05. Sonoma State Route 116 Capital Preventive Maintenance Project. Resurface Route 116 in Sonoma County from post mile (PM) 7.74 in Monte Rio to PM 25.05 near Sebastopol and install/replace streetlights, replace guard rails, repair or replace culverts, widen shoulders to provide Class II bike lanes and bike pull outs, add sidewalks and crosswalks, and upgrade the existing pedestrian infrastructures to current Americans with Disabilities Act standards. (MND) (PPNO 2910G) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))
  5. 05-05-SBt-101, PM 0.0/7.55. San Benito U.S. Route 101 Pavement Rehabilitation Project. Rehabilitate pavement, restore and/or rehabilitate drainage systems, upgrade traffic safety systems, replace or repair transportation management system elements and improve wildlife connectivity on US 101 in San Benito County from post miles 0.0 (Monterey-San Benito County line) to 7.55 (San Benito- Santa Clara County line). (MND) (PPNO 2776) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))
  6. °06-06-Kin-VAR, PM VAR/VAR. KIN 41 Drainage Restoration. Repair or replace 49 existing culverts on Route 33, Route 41, Route 43, Route 198, and Route 269 at various locations in Kings County. (ND) (PPNO 8088) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))
  7. °07-08-Riv-10, PM 32.6/44.4. Interstate 10 Minor Pavement Rehabilitation Project. Rehabilitate pavement, replace shoulder rumble strips, upgrade culverts, upgrade existing guardrail, upgrade Americans with Disabilities Act curb ramps, upgrade transportation management systems and ramp metering systems, upgrade crosswalk and bike lane striping, install a flashing beacon for pedestrian and bicycle facilities, and install rock blankets to improve roadside safety along I-10 between project limits in and near the cities of Palm Springs, Cathedral City, and Thousand Palms in Riverside County. (ND) (PPNO 3018N) (SHOPP)
  8. 08-10-Sta-4, PM 7.1/7.4. Hoods Creek Bridge Replacement. Replace Hoods Creek Bridge on Route 4 from post mile 7.1 to 7.4 in Stanislaus County. (MND) (PPNO 3526) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))
  9. °09-12-Ora-241, PM 15.1/27.8; 12-Ora-133, PM 12.8/13.6. SR-241/SR-133 Multi Asset Project. Rehabilitate existing pavement, restore drainage systems and increase safety of the roadway in various cities on Route 241 and Route 133 in Orange County. (MND) (PPNO 5490C) (SHOPP)
    (Related Item under Ref.: 2.5b.(2))

♠ (2) Approval of 6 Projects for Future Consideration of Funding: (° indicates items that were below the level of detail for updating the specific route pages)

  1. 01-02-Sha-5, PM R12.0/R24.7; 02-Teh-5, PM 40.7. Fix 5 Cascade Gateway Project/Cascade SHOPP Project. On I-5: The Fix 5 Cascade Gateway Project would construct and/or extend auxiliary lanes between interchanges, widen bridges with rail upgrades, install a median barrier, install signage, upgrade drainage facilities, install or upgrade intelligent transportation system (ITS) and transportation management system (TMS) elements, paving, install a vehicle charging facility, and construct a managed lane for part-time truck only operation in the northbound and southbound directions through a combination of constructing new lanes and converting existing multi-use lanes. The Cascade SHOPP Project would improve pavement quality, reduce maintenance efforts, minimize field maintenance exposure to traffic, upgrade bridge rails and install in-fill walls, upgrade drainage facilities, install ITS/TMS elements, increase vertical clearance at two structures, install a median barrier, and upgrade signs and lighting. (MND Addendum) (PPNO 3597 and PPNO 5200) (STIP) (SHOPP) (TCEP)
    (Related Items under Ref.: 2.1a.(3), 2.5b.(1) and 2.5s.(9))
  2. 02-05-SB-217, PM 0.9/1.3. State Route 217 San Jose Creek Bridge Replacement Project. Replace the existing San Jose Creek Bridge on Route 217 from Post Mile 0.9 to 1.3 in Santa Barbara County. (MND Addendum) (PPNO 2386Y) (SHOPP)
  3. °03-05-SLO. District 5 Maintenance Station and Equipment Shop Relocation Project. Replace and relocate the District 5 Maintenance Station and Equipment Shop facilities to 4485 Vachell Lane, in San Luis Obispo County. (FEIR Addendum) (PPNO 2920) (SHOPP)
    (Related Item under Ref.: 2.5b.(1))
  4. 04-08-SBd-40, PM R104.6/R120.5. San Bernardino County Interstate 40 Bridge and Rock Slope Protection Replacements. Restore Rock Slope Protection at Ardis Ditch Bridges, Tank Tower Ditch Bridges, and Homer Wash Bridges, and replace Woods Wash Bridges on I-40, west of the City of Needles, in San Bernardino County. (MND Addendum) (PPNO 3017K) (SHOPP)
    (Related Item under Ref.: 2.5b.(1))
  5. 05-08-SBd-138, PM T16.2/R17.4. State Route 138 Curve Revision. Realign Route 138, from 1.0 mile east of I-15 to just west of Hog Ranch Creek Bridge near the City of Hesperia in San Bernardino County. (MND Addendum) (PPNO 3019X) (SHOPP)
    (Related Item under Ref.: 2.5f.(3))
  6. °06-09-Iny-395, PM 57.9/R59.0. North Lone Pine Pavement. Rehabilitate pavement, enhance complete street and pedestrian features, upgrade existing drainage facilities, and related minor improvements on US 395, from post miles 57.9 to R59.0 in Lone Pine, Inyo County, California. (ND Addendum) (PPNO 2679) (SHOPP)
    (Related Item under Ref.: 2.5b.(1))

♠ (5) Approval of Project for Future Consideration of Funding: 01-DN-101, PM 12.7/16.5. Last Chance Grade Permanent Restoration Project. Permanent roadway restoration and realignment project on US 101 located approximately 10 miles south of Crescent City in Del Norte County, California. (FEIR) (PPNO 1112) (SHOPP)
(Related Items under Ref.: 2.5b.(4) and 4.4)

♠ (6) Approval of Project for Future Consideration of Funding: 06-Fre-99, PM 12.5/19.1. South Fresno State Route 99 Corridor Project. On Route 99: Reconstruct two existing half interchanges to create full interchanges at American Avenue and North Avenue, including reconstruction of existing overcrossings and construction of on- and off-ramps with sidewalks, curbs and gutters, lighting and signalization, and a stormwater system. (FEIR) (PPNO 6288) (STIP)

♠ (9) Approval of Project for Future Consideration of Funding: 08-Riverside County. I-10 Bypass: Banning to Cabazon Construction of a new two-lane roadway. (EIR) (PPNO 1334) (STIP)
(Related Item under Ref.: 2.5c.(3))

2.3a. Route Adoptions

There were no items of interest for this agenda item in the reviewed minutes.

2.3b. New Public Road Connection

There were no items of interest for this agenda item in the reviewed minutes.

2.3c. Relinquishments

♠ One Relinquishment Resolution:

  1. 07-LA-107-PM 0.0/4.8. Right of way along Route 107 (Hawthorne Boulevard) in the City of Torrance, from State Route 1 (Pacific Coast Highway) to the southerly city limits of Lawndale at Redondo Beach Boulevard.

2.3d. Vacations

There were no items of interest for this agenda item in the reviewed minutes.

2.5a Minor Projects

There were no items of interest for this agenda item in the reviewed minutes.

2.5b. Financial Allocations for SHOPP Projects / Federal Discretionary Grant Funds

♠ (1) Request $1,382,022,000 for 57 SHOPP projects — construction project phases (Con Sup, R/W Cap, Const Cap).
(Related Items under Ref.: 2.1a.(1), 2.1a.(3), 2.2c.(2), 2.5c.(1), 2.5c.(4), 2.5s.(9), and 2.5w.(2))

Of these, the following were of interest for the highway pages: (Uninteresting projects included environmental mitigation, drainage and culvert improvements, pavement rehabilitation, pedestrian and bike lane improvements, repairs and improvements to Caltrans buildings and labs, trash and water discharge capture, signage and guardrail repairs, and so forth)

  • #2. $8,050,000. 01-Hum-101 0.9. PPNO 01-2597; ProjID 0123000062; EA 0H641. US 101 Near Cooks Valley, at 0.9 mile north of Mendocino County line. Restore culvert and replace it with a concrete bridge structure to improve fish passage. CEQA – CE, 10/07/2024; Re-validation 06/12/2026. NEPA – CE, 10/07/2024; Re-validation 06/12/2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $1,150,000 ($1,147,352); PS&E $1,921,000 ($1,800,369); RW Sup $116,000 ($82,254). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $1,398,000; Const Cap $6,830,000.
  • #3. $12,256,000. 01-Hum-254 15.04. PPNO 01-4954; ProjID 0125000011; EA 0H245. Route 254 Near Weott, at 0.5 mile south of the Williford Road; also near Redcrest, at 0.3 mile south of Holmes Flat Road (PM 40.81). Construct two bridges, reduce sediment loads to South Fork Eel River, and remove fish passage barriers. Includes federal Culvert Aquatic Organism Passage (AOP) Grant amount of $5,000,000. CEQA – ND, 03/20/2024; Re-validation 06/30/2026. NEPA – CE, 03/06/2024; Re-validation 06/30/2026. Future consideration of funding approved under Resolution E-24-45; June 2024. As part of this allocation request, the Department is requesting to extend the completion of CONST and CON ENG an additional 13 months beyond the 36 month deadline. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $0 ($0); PS&E $0 ($0); RW Sup $0 ($0). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $2,544,000; Const Cap $11,709,000.
  • #5. $1,367,000. 01-Men-1 1.0. PPNO 01-4816; ProjID 0123000158; EA 0N180. Route 1 Near Gualala, at intersection with Ocean Drive. Construct left-turn lane. This project will improve safety and reduce the number and severity of collisions. CEQA – ND, 12/21/2023; Re-validation 04/02/2026. NEPA – CE, 02/07/2024; Re-validation 04/02/2026. Future consideration of funding approved under Resolution E-24-01; January 2024. As part of this allocation request, the Department is requesting to extend the completion of CONST and CON ENG an additional 12 months beyond the 36 month deadline. EA 0N180/PPNO 01-48166 combined with non-SHOPP EA 0C720/PPNO 01-4579 for construction under EA 0C72U/Project ID 0125000120. Related non-SHOPP allocations for EA 0C720/PPNO 01-4579 under Resolutions FP-26-14 and FATP-2627-02; August 2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $0 ($0); PS&E $0 ($0); RW Sup $0 ($0). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $439,000; Const Cap $1,037,000 .
  • #18. $266,730,000. 04-Ala-24 R5.7/R6.2. PPNO 04-0480B; ProjID 0414000011; EA 0J540. Route 24 In Orinda, at the Caldecott Tunnel № 28-0015R, 28-0015, and 28-0015L; also in Contra Costa at Caldecott Tunnel (R0.0/R0.7). Rehabilitate and upgrade ventilation system of Caldecott Tunnel Bores 1, 2, and 3. This is a Construction Manager/General Contractor (CMGC) project. CEQA – MND, 06/26/2025; Re-validation 05/06/2026. NEPA – FONSI, 06/26/2025; Re-validation 05/06/2026. Future consideration of funding approved under Resolution E-25-48; August 2025. SB1 Baseline Agreement approval under Resolution SHOPP-P-2526-03B; December 2025. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $6,269,000 ($6,259,755); PS&E $14,400,000 ($12,623,146); RW Sup $184,000 ($10,402). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $20,850,000; Const Cap $203,402,000 .
  • #21. $220,503,000. 04-Mrn-37 R11.4/13.5. PPNO 04–2925W; ProjID 0424000193; EA 4Q321. Route 37 In and near Novato, from 0.2 mile east of Route 101 to 0.2 mile west of Atherton Avenue. Replace Novato Creek Bridge № 27-0011L/R and construct drainage systems. (Additional contribution of $15,000,000 for PS&E from the General Fund provided by Assembly Bill 179 (AB 179); Additional contribution of $25,000,000 for Const Cap from Transportation Authority of Marin (TAM).) CEQA – EIR, 01/30/2024; Re-validation 06/30/2026. NEPA – FONSI, 01/30/2024; Re-validation 06/30/2026. Future consideration of funding approved under Resolution E-24-24; March 2024. Six-month allocation time extension for CON ENG and CONST approved under Waiver 26-102; June 2026. As part of this allocation request, the Department is requesting to extend the completion of CONST and CON ENG an additional 24 months beyond the 36 month deadline. Concurrent Amendment under SHOPP Amendment 26H-003; August 2026. SB1 Baseline Agreement approval under Resolution SHOPP-P-2324-08B; June 2024. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $0 ($0); PS&E $0 ($0); RW Sup $0 ($0). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $30,000,000 + $3,958,000 (RMRA) ($34,500,000); Const Cap $165,500,000 ($186,003,000) (plus the additional contributions).
  • #22. $7,527,000. 04-Son-12 35.75/36.1. PPNO 04-2921L; ProjID 0423000292; EA 3Y710. Route 12 Near the city of Sonoma, from 0.2 mile east of Siesta Way to Lomita Avenue. Construct left-turn lane onto Verano Avenue, install audible accessible pedestrian signals (APS), and upgrade facilities to Americans with Disabilities Act (ADA) standards. This project will improve safety and reduce the number and severity of collisions. CEQA – CE, 11/26/2024; Re-validation 03/16/2026. NEPA – CE, 11/26/2024; Re-validation 03/16/2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $1,000,000 ($991,868); PS&E $1,405,000 ($1,368,527); RW Sup $470,000 ($174,957). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $1,500,000 ($1,730,000); Const Cap $5,800,000 ($5,797,000).
  • #34. $11,550,000. 07-LA-107 0.00/4.80. PPNO 07-6551; ProjID 0726000177; EA 1A620. Route 107 In Torrance, from Route 1 (Pacific Coast Highway) to Redondo Beach Boulevard. Financial Contribution Only (FCO) to City of Torrance to relinquish roadway. Concurrent Amendment under SHOPP Amendment 26H-003; August 2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $0 ($0); PS&E $0 ($0); RW Sup $0 ($0). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $0; Const Cap $11,550,000.
  • #41. $35,154,000. 08-SBd-40 R104.6/R120.5. PPNO 08-3017K; ProjID 0820000156; EA 1L800. I-40 Near Needles, from Woods Wash Bridges to Homer Wash Bridges at various locations. Replace two bridges and restore Rock Slope Protection (RSP) at six bridges to mitigate scour. CEQA – MND, 06/26/2025; Re-validation 06/17/2026 NEPA – CE, 06/27/2025; Re-validation 06/17/2026. Future consideration of funding approved under Resolution E-25-49; August 2025. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $4,285,000 ($3,790,685); PS&E $2,258,000 ($1,627,031); RW Sup $98,000 ($11,594). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $4,850,000 ($5,655,000); Const Cap $25,473,000 ($29,499,000).
  • #46. $25,710,000. 10-Mer-59 R0.0/12.1. PPNO 10-3439; ProjID 1018000284; EA 0V690. Route 59 Near Merced, from Route 152 to Reilly Road. Rehabilitate pavement, upgrade guardrail and lighting, replace sign panels, construct rumble strips, rehabilitate drainage, replace one bridge, and rehabilitate two bridge decks. This project will extend the pavement service life and improve ride quality. CEQA – MND, 01/12/2023; Re-validation 10/13/2025 NEPA – CE, 01/12/2023; Re-validation 10/13/2025. Future consideration of funding approved under Resolution E-22-68; August 2022. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $0 ($0); PS&E $200,000 ($27,913); RW Sup $50,000 ($3,512). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $2,793,000 ($2,973,000); Const Cap $23,030,000 ($22,737,000).
  • #48. $10,680,000. 10-Mer-140 16.0/16.5. PPNO 10-3438; ProjID 1017000175; EA 1H020. Route 140 Near Hilmar, at the intersection of Route 140 (PM 16.0/16.5) and Route 165 (PM 26.6/27.1). Construct roundabout to improve traffic operations and mobility. CEQA – CE, 05/27/2022; Re-validation 06/02/2026 NEPA – CE, 05/27/2022; Re-validation 06/02/2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $1,378,000 ($992,264); PS&E $2,266,000 ($1,995,936); RW Sup $641,000 ($479,167). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $1,071,000 ($1,180,000); Const Cap $9,500,000.

♠ (2) Request of $119,592,000 for 67 2026 SHOPP preconstruction project phases for environmental support, design, and R/W support, as follows:
(Related Items under Ref.: 2.1a.(1) and 2.2c.(1))

  • (2a) $65,554,000 for 37 SHOPP support phases
  • (2b) $54,038,000 for 30 SHOPP Senate Bill 1 (SB 1) support phases

Of these, the following were of interest for the highway pages: (Uninteresting projects included environmental mitigation, drainage and culvert improvements, pavement rehabilitation, pedestrian and bike lane improvements, repairs and improvements to Caltrans buildings and labs, trash and water discharge capture, signage and guardrail repairs, and so forth)

  • (2a) #3. $3,262,000. 01-Lak-29 31.4/33.7. PPNO 01-3129; ProjID 0123000032; EA 0M570. Route 29 Near Kelseyville, from 1.0 mile south of Bottle Rock Road to 0.7 mile north of Cole Creek Road. Widen shoulders, establish four-foot median, construct left-turn lane, and construct rumble strips. CEQA – CE, 6/25/2026. Two month allocation time extension for PS&E and R/W Sup approved under Waiver 26-102; June 2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual, if different): PS&E $2,876 ($2,600) ; RW Sup $565 ($662).
  • (2a) #5. $1,950,000. 02-Sha-44 R7.75/R8.25. PPNO 02-3976; ProjID 0226000029; EA 3K230. Route 44 Near Palo Cedro, at the intersection of Silver Bridge Road. Construct roundabout. Concurrent Amendment under SHOPP Amendment 26H-003; August 2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual, if different): PA&ED $1,950.
  • (2a) #30. $970,000. 11-Imp-86 62.38. PPNO 11-1627; ProjID 1125000091; EA 43272. Route 86 Near Salton City, at intersection with Black Diamond Road. Construct roundabout.Concurrent Amendment under SHOPP Amendment 26H-003; August 2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual, if different): PA&ED $970.
  • (2b) #8. $3,807,000. 03-Pla-267 0.0/9.63. PPNO 03-5728; ProjID 0321000197; EA 2J190. Route 267 Near Truckee, from Nevada County line to Dolly Varden Avenue. Rehabilitate pavement and drainage systems, upgrade guardrail and facilities to Americans with Disabilities Act (ADA) standards, and extend southbound truck climbing lane. Concurrent consideration of funding under Resolution E-26-47; August 2026. Four month allocation time extension for PS&E and R/W Sup approved under Waiver 26-102; June 2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual, if different): PS&E $3,130; RW Sup $600 ($677).
  • (2b) #15. $4,772,000. 05-SBt-101 0.0/7.55. PPNO 05-2776; ProjID 0518000079; EA 1J840. US 101 Near Prunedale, San Juan Bautista, Aromas and Sargent, from Monterey County line to Santa Clara County line. Rehabilitate pavement and drainage systems, replace Transportation Management System (TMS) elements, upgrade lighting, and construct concrete barrier, and install wildlife crossing. Concurrent consideration of funding under Resolution E-26-50; August 2026. As part of this allocation request, the Department is requesting to extend the completion of PS&E an additional 11 months beyond the 36 month deadline. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual, if different): PS&E $3,792 ($4,341); RW Sup $377 ($431).
  • (2b) #20. $3,391,000. 10-Sta-4 7.3. PPNO 10-3526; ProjID 1020000178; EA 1H230. Route 4 Near Copperopolis, at Hoods Creek Bridge № 38-0041. Replace bridge. (G13 Contingency) Concurrent consideration of funding under Resolution E-26-53; August 2026. Four month allocation time extension for PS&E and R/W Sup approved under Waiver 26-102; June 2026. Pre-Construction Phase Allocation ($ × $1000): Budgeted (Actual, if different): PS&E $2,511 ($2,886); RW Sup $505.

♠ (4) Request for $218,211,000 in pre-construction support for the Last Chance Grade Tunnel Bypass project on US 101, in Del Norte County. (EA 0F280, PPNO 1112)
(Related Items under Ref.: 2.2c.(5) and 4.4)

2.5c Financial Allocations for STIP Projects

♠ (1) Request of $75,610,000 for three State-administered STIP projects, on the State Highway System.
(Related Items under Ref.: 2.5b.(1))

Of these, the following were of interest for the highway pages: (Uninteresting projects included environmental mitigation, drainage and culvert improvements, pavement rehabilitation, pedestrian and bike lane improvements, repairs and improvements to Caltrans buildings and labs, trash and water discharge capture, signage and guardrail repairs, and so forth)

  • #2. $49,040,000. 06-Mad-99 0.1/8.1. PPNO 06-6297; ProjID 0612000158; EA 0H220. South Madera 6 Lane. In Madera County, on Route 99 from North of Fresno-Madera County line to South of Avenue 7 to North of Avenue 12. This project will improve goods movement and passenger travel along Route 99 by median widening from 4 to 6 lanes. It will also upgrade drainage, construct drainage basins and median barrier, and increase vertical clearance at one structure. CEQA – MND, 04/22/2021; Re-validation 02/12/2026. NEPA – FONSI, 04/22/2021; Re-validation 02/12/2026. Future consideration of funding approved under Resolution E-21-55; June 2021. Right of Way Certification: 02/06/2026. Contribution from other sources: $57,120,000. The additional funding need of $5,840,000 in IIP funds for CON and CON ENG will come from future interregional shares. Concurrent SHOPP allocation for EA 1E070/PPNO 06-8002 under Resolution FP-26-08; August 2026. EA 0H220/PPNO 06-6297 combined with EA 1E070/PPNO 06-8002 for construction under EA 0H22U/PPNO 8169/Project ID 0625000148. As part of this allocation request, the department is requesting to extend the period of construction an additional 10 months beyond the 36-month Timely Use of Funds deadline. This allocation will split out and create two Child Projects- Tree Replacement and EV Station Monitoring, under PPNO 06-8177 and PPNO 06-8178 from this Parent project (PPNO 06-6297) and fund it with $4,060,000 in IIP funds as follows: for PPNO 8177 $1,017,000 for PS&E in FY 26-27, $93,000 for RW Sup in FY 26-27, $811,000 for CON ENG and $735,000 for CON phase in FY 27-28; and for PPNO 8178 $95,000 for PA&ED in FY 26-27, $304,000 for PS&E in FY 26-27, $41,000 for RW Sup in FY 26-27, $264,000 for CON ENG and $700,000 for CON phase in FY 27-28. Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $4,000,000 $4,610,000; Const Cap $39,200,000 $44,430,000.
  • #3. $25,700,000. 12-Ora-74 1.0/2.1 R2.2. PPNO 12-4110; ProjID 1200000051; EA 08692. SR-74 Gap closure and multimodal improvements. This project will provide a gap closure on Route 74/Ortega Highway which will eliminate an existing choke point in the City of San Juan Capistrano between Calle Entradero and Reata Road. The project will include a five- to eight-foot shoulder in each direction plus Class II bicycle lanes, sidewalk reconstruction, cross-walk re-striping, a new traffic signal at Via Cordova and Hunt Club Drive, and providing a 12-foot wide striped median. The project also includes seven retaining walls. CEQA – EIR, 05/07/2020; Re-validation 04/02/2026. NEPA – FONSI, 05/07/2020; Re-validation 04/02/2026. Future consideration of funding approved under Resolution E-23-138A; October 2023. Right of Way Certification: 06/24/2026. As part of this allocation request, the Department is requesting to extend the period of construction an additional 3 months beyond the 36-month Timely Use of Funds deadline. Contribution from other sources: $35,500,000. Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $6,800,000 $7,900,000; Const Cap $17,800,000.

♠ (2) Request of $700,000 for the locally-administered STIP South Arcata Multi-Modal Safety Improvements project, on US 101 and Route 255 (~ 01-Hum-255 8.781/01-Hum-101 85.808) on the State Highway System, in Humboldt County. (PPNO 3308)

♠ (4) Request of $8,450,000 for the State-Administered multi-funded STIP and ATP Gualala Downtown Streetscape Enhancement Project, on Route 1 on the State Highway System, in Mendocino County. (PPNO 4579)
(Related Item under Ref.: 2.5b.(1))

♠ (10) Request of $62,793,000 for the State-Administered multi-funded STIP and LTCAP State Route 37 Sears Point to Mare Island Improvement Project Phase 1, on the State Highway System, in Sonoma County. (PPNO 2364E)
(Related Item under Ref.: 2.5d.(5))

2.5d Allocations for Projects with Costs that Exceed 20 Percent of the Programmed Amount

♠ (2) Request for $1,055,000 (28.5 percent increase) allocation in Construction Capital and $775,000 (5.4 percent increase) allocation in Construction Support, for the SHOPP Safety Improvements project on State Route 213, in Los Angeles County. (EA 38140, PPNO 5870)

♠ (3) Request for $64,681,000 (30.4 percent increase) allocation in Construction Capital and $10,500,000 (2.3 percent increase) allocation in Construction Support, for the SHOPP Bridge Rehabilitation and Replacement project on Interstate 40, in San Bernardino County. (EA 0R380, PPNO 3001S)

♠ (4) Request for $146,000,000 (54.0 percent increase) allocation in Construction Capital and $16,000,000 (6.7 percent increase) allocation in Construction Support, for the SHOPP Bridge Rehabilitation and Replacement project on Route 75 and I-5, in San Diego County. (EA 43063, PPNO 1352)
(Related Item under Ref.: 2.1a.(1))

♠ (5) Request for $27,157,000 (53.8 percent increase) allocation in Construction Capital and $5,197,000 (53.0 percent increase) allocation in Construction Support, for the SHOPP Operational Improvements project on State Routes 37 and 121, in Sonoma County. (EA 2Q20U, PPNO 2911K)
(Related Item under Ref.: 2.5c.(10))

2.5e Supplemental Fund Allocations

♠ (1) Request for an additional $2,470,000 (53.2 percent increase) in Construction Support for the SHOPP Bridge Rail Replacement and Upgrade project on State Route 36, in Humboldt County. (EA 0C500, PPNO 2363)

♠ (4) Request for an additional $1,700,000 (10.9 percent increase) in Construction Support for the STIP Route 46/Route 41 Wye project on Route 41 and Route 46, in San Luis Obispo County. (EA 3307C, PPNO 0226K)
(Related Item under Ref.: 2.8c.(4))

2.5f Financial Allocations for SHOPP

♠ Informational Reports on Allocations Under Delegated Authority
(Related Items under Ref.: 2.1a.(1) and 2.2c.(2))

  • Emergency G-11 Allocations (2.5f.(1)): $67,019,000 for 22 projects.
  • SHOPP Safety Sub-Allocations (2.5f.(3)): $112,819,000 for 11 projects.
  • Minor G-19-05a Allocations (2.5f.(4)): $6,914,000 for six projects.

The following projects were of interest for the highway pages. Uninteresting projects included emergency storm damage mitigation that was primarily repairs; repairing damage from unhoused individuals; and damage from accidents, because all of these eventually restore the facility to the condition it was in before the emergency (and thus there is no new facility or significant change to the facility).

  • (1) #1. $23,000,000. 01-Hum-101 79.5L/80.2. PPNO 01-3327; ProjID 0126000138; EA 0R250. US 101 In Eureka, at Eureka Slough Bridge № 04-0022L. On April 13, 2026, a routine underwater inspection of the Eureka Slough Bridges was performed, prompting a Record of Critical Finding (RCF) for the southbound bridge. The RCF documented that the southeast end of the pile cap under Column 3 of Bent 7 is undermined and there are six missing piles. The likely cause of missing piles is attack by marine borers. This bridge is a high volume and high speed utility. The traffic has been shifted away from the affected area to reduce the live load effects and tilt sensors have been installed. The bridge is under continuous monitoring with a potential of full closure if the movement exceeds tolerable thresholds. This project will construct a work trestle parallel to and west of the bridge to perform geotechnical investigations and to provide construction access for potential solutions. After the completion of further analysis, a supplemental will be submitted for project’s full scope and funding. Breakdown: †R/W Sup $100,000; †R/W Cap $100,000; Con Sup $3,500,000; Const $19,500,000 (†additional funds allocated for pre-construction phases).
  • (3) #1. $20,400,000. 01-Men-101 R9.5/10.8. PPNO 01-4763; ProjID 0121000072; EA 0L110. US 101 Near Hopland, from Hopland Overhead to Mountain House Road. Widen shoulders and add left-turn lanes and a merge lane. This project will improve safety and reduce the number and severity of collisions. CEQA – ND, 01/17/2025; Re-validation 06/23/2026. NEPA – CE, 01/17/2025; Re-validation 06/23/2026. Future consideration of funding approved under Resolution E-25-13; March 2025. Two month allocation time extension for CONST and CON ENG approved under Waiver 26-102; June 2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $2,798,000 ($2,790,120); PS&E $2,450,000 ($2,381,359); RW Sup $380,000 ($37,714). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $3,148,000; Const Cap $20,495,000.
  • (3) #2. $18,042,000. 01-Men-101 39.7/40.4. PPNO 01-4772; ProjID 0121000105; EA 0L380. US 101 Near Willits, from 1.2 miles south to 0.5 mile south of Black Bart Drive. Widen shoulders, realign roadway, place High Friction Surface Treatment (HFST), construct Maintenance Vehicle Pullouts (MVPs), replace median barrier, and install rumble strips. This project will improve safety and reduce the number and severity of collisions. CEQA – CE, 06/27/2024; Re-validation 05/29/2026. NEPA – CE, 06/27/2024; Re-validation 05/29/2026. Two month allocation time extension for CONST and CON ENG approved under Waiver 26-102; June 2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $1,839,000 ($1,756,092); PS&E $1,639,000 ($1,533,913); RW Sup $272,000 ($54,624). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $3,318,000; Const Cap $15,615,000 .
  • (3) #6. $5,300,000. 03-Sut-113 0.4/1.1. PPNO 03-8508; ProjID 0322000146; EA 2J980. Route 113 Near Knights Landing, from 0.4 mile north of Yolo County line to 0.3 mile south of Leiser Road. Flatten and realign the curve. This project will improve safety and reduce the number and severity of collisions. CEQA – CE, 03/13/2024; Re-validation 05/07/2026. NEPA – CE, 03/13/2024; Re-validation 05/07/2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $1,200,000 ($1,199,580); PS&E $1,130,000 ($998,693); RW Sup $320,000 ($272,552). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $1,050,000; Const Cap $4,250,000.
  • (3) #7. $7,716,000. 05-Mon-101 76.8/84.7. PPNO 05-3253; ProjID 0525000063; EA 1S590. US 101 Near Chualar and Salinas, from 0.2 mile south of Main Street to 0.9 mile south of Airport Boulevard. Remove at-grade median openings to improve safety and reduce the frequency and severity of collisions involving crossing and left-turn movements. CEQA – CE, 11/25/2024; Re-validation 05/07/2026 NEPA – CE, 06/12/2025; Re-validation 05/07/2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $0 ($0); PS&E $1,572,000 ($1,525,978); RW Sup $527,000 ($102,268). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $1,544,000; Const Cap $5,388,000.
  • (3) #9. $13,866,000. 08-SBd-138 T16.2/R17.35. PPNO 08-3019X; ProjID 0821000070; EA 1M080. Route 138 Near Cajon Junction, from 0.9 mile east of Wagon Train Road to Hog Ranch Creek Bridge. Realign horizontal and vertical curves, construct 8- foot shoulders, and install rumble strips and guardrail. This project will improve safety and reduce the number and severity of collisions. CEQA – MND, 04/09/2025; Re-validation 06/12/2026 NEPA – CE, 04/09/2025; Re-validation 06/12/2026. Future consideration of funding approved under Resolution E-25-29; May 2025. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $1,938,000 ($1,920,799); PS&E $2,415,000 ($1,685,424); RW Sup $400,000 ($60,510). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $2,003,000; Const Cap $10,281,000.
  • (3) #11. $11,456,000. 12-Ora-22 R0.6/R2.0. PPNO 12-2870A; ProjID 1221000088; EA 0T020. Route 22 In Garden Grove, from Route 405 to Springdale Street. Construct auxiliary lane and modify exit ramp. This project will improve safety and reduce the number and severity of collisions. CEQA – CE, 09/12/2024; Re-validation 03/05/2026 NEPA – CE, 09/12/2024; Re-validation 03/05/2026. Pre-Construction Expenditures: Budgeted (Expended): PA&ED $1,136,000 ($1,124,037); PS&E $1,864,000 ($1,775,064); RW Sup $298,000 ($118,909). Construction Phase Allocation: Budgeted (Actual, if different): Con Sup $2,571,000; Const Cap $8,000,000.

2.5g Prop 1B Project Allocations

There were no items of interest for this agenda item in the reviewed minutes.

2.5p Local Transportation Climate Adaptation Program (LTCAP) Allocations

There were no items of interest for this agenda item in the reviewed minutes.

2.5s Senate Bill 1 Programs Project Allocations Local Partnership Program (LPP) Allocations

♠ (7) Local Partnership Program (LPP) (Formulaic) – Allocation Amendment. Request to amend the locally-administered LPP (Formulaic) I-5 Improvement Project from I-405 to Yale Avenue, Segment 1 on the State Highway System, in Orange County, to deallocate $3,743,000 from the Right of Way (RW) phase due to the funds lapsing. (PPNO 2743)
(Related Items under Ref.: 4.20 and 4.21)

♠ (8) Multi-funded Trade Corridor Enhancement Program (TCEP), LPP (Competitive), and STIP – Allocation Amendment. Request to amend the State-Administered TCEP, LPP (Competitive), and STIP State Route 55 Corridor Improvements from I-405 to I-5 project, on the State Highway System, in Orange County, to move $843,000 from Construction Capital to Construction Engineering due to increased construction engineering costs. There is no change to the allocation amount. (PPNO 3470)
(Related Items under Ref.: 2.8c.(1) and 2.8c.(3))

♠ (9) Request for $78,308,000 (59.0 percent increase) allocation in Construction Capital and $7,480,000 (zero percent increase) allocation in Construction Support, for the State-Administered multi-funded STIP and TCEP Fix 5 Cascade Gateway / I-5 Improvements Shasta project on I-5, in Shasta and Tehama counties. (EA 0H920, PPNO 3597)
(Related Items under Ref.: 2.1a.(3), 2.2c.(2) and 2.5b.(1))

♠ (10) Request of $6,641,000 for the State-Administered LPP (Formulaic) Route 91 Improvement Project between La Palma Avenue and Route 55 (Segment 2), on the State Highway System, in Orange County. (PPNO 4570C)

2.5t Traffic Congestion Relief Program (TCRP) Allocations

There were no items of interest for this agenda item in the reviewed minutes.

2.5w Active Transportation Program (ATP) Allocations

There were no items of interest for this agenda item in the reviewed minutes.

2.6g Transit and Intercity Rail Capital Program (TIRCP) Allocations

There were no items of interest for this agenda item in the reviewed minutes.

4. TCIF and Aeronautic Program Updates / Policy Matters

♠ 4.4 Update on the Last Chance Grade Project located on US 101 in Del Norte County
(Related Items under Ref.: 2.2c.(5) and 2.5b.(4))

♠ 4.17 Update on the San Diego-Coronado Bay Bridge Foundation Rehabilitation/Deterrent Barrier Projects on State Route 75 in San Diego County

♠ 4.20 Local Partnership Formulaic Program Amendment
(Related Items under Ref.: 2.5s.(7), 2.6s.(3), and 4.9)

  • Add six projects in Los Angeles, Napa, and Alameda Counties and program $32,545,000
  • Deprogram $4,006,000 from two projects Resolution LPP-P-2627-01,

The following projects were of interest for the highway pages. Uninteresting projects included those off the state highway system, and those primarily related to transit or rail.

  • Deprogram $3,743,000 in Formulaic Program funds from the Right of Way Phase of the I-5 Improvement from Interstate 405 to Yale Avenue Project in Orange County. The project was unable to meet the Timely Use of Funds Policy deadline for expenditure. $3,743,000 will be redistributed in the 2024 Local Partnership Program Formulaic Fund Distribution among all eligible taxing authorities in Reference Number 4.21, in accordance with Program Guidelines.
  • Deprogram $263,000 in Formulaic Program funds from the Plans, Specifications, and Estimates Phase of the National Trails Highway Bridge Replacements (County Sign Route 66, Former US 66), Amboy to Kelbaker Project in San Bernardino County. The project was unable to meet the Timely Use of Funds Policy deadline for allocation. $263,000 will be redistributed in the 2024 Local Partnership Program Formulaic Fund Distribution among all eligible taxing authorities in Reference Number 4.21, in accordance with Program Guidelines.

Other Matters/Public Comment

There were no items of interest for this agenda item in the reviewed minutes.

FREQUENTLY USED TERMS IN CTC MINUTES: California Transportation Commission (Commission or CTC), California Department of Transportation (Department or Caltrans), Regional Improvement Program (RIP), Interregional Improvement Program (IIP), State Transportation Improvement Program (STIP), State Highway Operation and Protection Program (SHOPP), Traffic Congestion Relief Program (TCRP), Public Transportation Account (PTA), Clean Air and Transportation Improvement Act of 1990 (Proposition 116), High Speed Passenger Train Bond Program (Proposition 1A), Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006 (Proposition 1B), Corridor Mobility Improvement Account (CMIA), State Route 99 Bond Program (RTE or SR 99), Local Bridge Seismic Retrofit Account (LBSRA), Trade Corridors Improvement Fund (TCIF), Highway-Railroad Crossing Safety Account (HRCSA), State-Local Partnership Program (SLPP), Traffic Light Synchronization Program (TLSP), Letter of No Prejudice (LONP), Environmental Phase (PA&ED), Design Phase (PS&E), Right of Way (R/W), Fiscal Year (FY), Active Transportation Program (ATP), Intercity Rail (ICR), California Aid to Airports Program (CAAP), Acquisition & Development (A&D), Transit and Inter-City Rail Capital Program (TIRCP), Transportation Facilities Account (TFA), Trade Corridor Enhancement Program (TCEP), Local Partnership Program (LPP), Local Streets and Roads Program (LSRP), Solutions for Congested Corridors Program (SCCP).

Share

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.